A Framework for Construction-related Risks by integrating the Fuzzy Grey Comprehensive Evaluation Method (FGCE)
Received: 13 June 2024 | Revised: 3 July 2024 | Accepted: 11 July 2024 | Online: 9 October 2024
Corresponding author: Rana Jabbar Kasid Jalhoom
Abstract
There are five basic phases for construction projects: planning, design, tendering, construction and maintenance. The risks of each phase have an impact on time, cost, and quality. In this paper, the tendering phase of the residential complex project was investigated as a case study, and the creation of a fuzzy and grey correlation analysis model was examined using a fuzzy theory and a grey correlation theory to dispel the professional judgment around the project phase. Creating a comparison and a reference matrix based on grey theory and/by examining factors and their impact on duration, cost, and quality separately, gives the construction investors a scientific, direct, flexible, and adaptable technique to assess project risks. The described method categorized the tendering phase risk based on the three project determinants: duration, cost, and quality. The correlation degree is greater than 0.5, hence construction project duration risk is almost nonexistent. The project investor must also investigate risk assumption, reduction, diversion, and evasion tactics to handle cost and quality risks, which are between 0.2 and 0.5. This suggests that tender phase issues do not affect project length but do affect cost and quality, requiring attention and action.
Keywords:
grey correlation theory, risk assessment, fuzzy set theory, construction projectsDownloads
References
A. A. Alfahad and A. M. Burhan, "Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector," Journal of Engineering, vol. 30, no. 02, pp. 154–178, Feb. 2024. DOI: https://doi.org/10.31026/j.eng.2024.02.11
S. Radi Al-Aga and A. Burhan, "Risk Assessment in BOT Contracts using AHP Technique," Journal of Engineering, vol. 29, pp. 61–75, Jan. 2023. DOI: https://doi.org/10.31026/j.eng.2023.01.04
E. K. Rasheed, "Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq," Journal of Engineering, vol. 21, no. 04, pp. 1–19, Dec. 2015. DOI: https://doi.org/10.31026/j.eng.2015.04.10
T. N. Mahmoud and K. R. Erzaij, "Develop Proactive System for Risk Management (DPSRM) for Lagging Investment Project in Iraq.," Journal of Engineering, vol. 29, no. 07, pp. 137–152, Jul. 2023. DOI: https://doi.org/10.31026/j.eng.2023.07.09
A. A. Alfahad and A. M. Burhan, "BIM-Supporting System by Integrating Risk Management and Value Management," Engineering, Technology & Applied Science Research, vol. 13, no. 6, pp. 12130–12137, Dec. 2023. DOI: https://doi.org/10.48084/etasr.6427
S. H. N. Alani and A. M. R. Mahjoob, "Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology," Engineering, Technology & Applied Science Research, vol. 11, no. 3, pp. 7223–7227, Jun. 2021. DOI: https://doi.org/10.48084/etasr.4060
S. F. R. Al-Aga and A. M. Burhan, "Appropriate Risk Response Planning of Build Operate Transfer Contracts for the Transportation Projects in Iraq," Civil and Environmental Engineering, vol. 18, no. 2, pp. 430–437, Dec. 2022. DOI: https://doi.org/10.2478/cee-2022-0040
A. M. Burhan, Risk management in construction projects. Baghdad, Iraq: University of Baghdad., 2003.
E. K. Rasheed, "Development of a Blueprint Impact System of the risks on construction projects Implementation," Journal of Engineering, vol. 21, no. 08, pp. 28–49, Aug. 2015. DOI: https://doi.org/10.31026/j.eng.2015.08.12
H. O. Ghaeb and A. M. R. Mahjoob, "Risk Response in Construction Project: A Review Study," Journal of Engineering, vol. 29, no. 08, pp. 121–137, Aug. 2023. DOI: https://doi.org/10.31026/j.eng.2023.08.09
H. O. G. Aljorany and A. M. R. Mahjoob, "A Mathematical Model to Predict Optimal Risk Response Budget using Genetic Algorithm," Engineering, Technology & Applied Science Research, vol. 14, no. 3, pp. 14492–14496, Jun. 2024. DOI: https://doi.org/10.48084/etasr.7326
S. Ebrahimnejad, S. M. Mousavi, and S. M. H. Mojtahedi, "A fuzzy decision-making model for risk ranking with an application to an onshore gas refinery," International Journal of Business Continuity and Risk Management, vol. 1, no. 1, pp. 38–66, Jan. 2009. DOI: https://doi.org/10.1504/IJBCRM.2009.028950
R. J. K. Jalhoom and A. M. R. Mahjoob, "An Extensive Literature Review on Risk Assessment Models (Techniques and Methodology) for Construction Industry," Journal of Engineering, vol. 29, no. 08, pp. 76–93, Aug. 2023. DOI: https://doi.org/10.31026/j.eng.2023.08.06
M. Aguria, S. Q. Wang, and M. Dulaimi, "Risk management framework for construction project in developing countries," Construction Management & Economics, vol. 22, pp. 237–252, Feb. 2004. DOI: https://doi.org/10.1080/0144619032000124689
J. H. M. Tah and V. Carr, "A proposal for construction project risk assessment using fuzzy logic," Construction Management and Economics, vol. 18, no. 4, pp. 491–500, Jun. 2000. DOI: https://doi.org/10.1080/01446190050024905
R. Tavakkoli-Moghaddam, S. M. Mousavi, and H. Hashemi, "A Fuzzy Comprehensive Approach for Risk Identification and Prioritization Simultaneously in EPC Projects," in Risk Management in Environment, Production and Economy, IntechOpen, 2011. DOI: https://doi.org/10.5772/16247
B. Oztaysi, "A decision model for information technology selection using AHP integrated TOPSIS-Grey: The case of content management systems," Knowledge-Based Systems, vol. 70, pp. 44–54, Nov. 2014. DOI: https://doi.org/10.1016/j.knosys.2014.02.010
Y. Dou, Q. Zhu, and J. Sarkis, "Evaluating green supplier development programs with a grey-analytical network process-based methodology," European Journal of Operational Research, vol. 233, no. 2, pp. 420–431, Mar. 2014. DOI: https://doi.org/10.1016/j.ejor.2013.03.004
Downloads
How to Cite
License
Copyright (c) 2024 Rana Jabbar Kasid Jalhoom, Ahmed Mohammed Raoof Mahjoob
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.