Contractor’s Selection Criteria in Construction Works in Pakistan
Abstract
The contractor is the primary stakeholder in materializing a project concept. For the successful completion of any project, it is compulsory for the contractor to have relevant experience. The selection of the appropriate contractor depends on various criteria. This study aims to study these selection criteria. Based on 71 questionnaire forms received from representatives of contractor, consultant and client firms involved in execution works of construction activities it is found that quality, bid amount, technical capability, financial stability, and experience are five commonly adopted criteria for contractor selection in construction works in Pakistan. On the other hand, quality, technical capability, financial stability, equipment availability, and management capability are reported as the top five effective criteria for appropriate contractor selection for any construction project.
Keywords:
contractor selction, selection criteria, Pakistan, Sindh, construction worksDownloads
References
A. P. C. Chan, A. P. L. Chan, “Key performance indicators for measuring construction success”, Benchmarking: an International Journal, Vol. 11, No. 2, pp. 203-221, 2004 DOI: https://doi.org/10.1108/14635770410532624
A. P. C. Chan, D. W. M. Chan, Y. H. Chiang, B. S. Tang, E. H. W. Chan, K. S. Ho, “Exploring critical success factors for partnering in construction projects”, Journal of Construction Engineering and Management, Vol. 130, No. 2, pp. 188-198, 2004 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(188)
Z. Hatush, M. Skitmore, “Criteria for contractor selection”, Construction Management & Economics, Vol. 15, No. 1, pp. 19-38, 1997 DOI: https://doi.org/10.1080/014461997373088
A. Enshassi, S. Mohamed, Z. Modough, “Contractors’ selection criteria: opinions of Palestinian construction professionals”, International Journal of Construction Management, Vol. 13, No. 1, pp. 19-37, 2013 DOI: https://doi.org/10.1080/15623599.2013.10773203
S. T. Ng, R. M. Skitmore, “Contractor selection criteria: a cost-benefit analysis”, IEEE Transactions on Engineering Management, Vol. 48, No. 1, pp. 96-106, 2001 DOI: https://doi.org/10.1109/17.913169
E. Palaneeswaran, M. M. Kumaraswamy, “Contractor selection for design/build projects”, Journal of Construction Engineering and Management, Vol. 126, No. 5, pp. 331-339, 2000 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(331)
M. A. Munir, M. A. Zaheer, M. Haider, M. Z. Rafique, M. A. Rasool, M. S. Amjad, “Problems and barriers affecting total productive maintenance implementation”, Engineering, Technology & Applied Science Research, Vol. 9, No. 5, pp. 4818-4823, 2019 DOI: https://doi.org/10.48084/etasr.3082
J. S. Russell, M. J. Skibniewski, “Decision criteria in contractor prequalification”, Journal of Management in Engineering, Vol. 4, No. 2, pp. 148-164, 1998 DOI: https://doi.org/10.1061/(ASCE)9742-597X(1988)4:2(148)
G. D. Holt, P. O. Olomolaiye, F. C. Harris, “Evaluating prequalification criteria in contractor selection”, Building and Environment, Vol. 29, No. 4, pp. 437-448, 1994 DOI: https://doi.org/10.1016/0360-1323(94)90003-5
Z. Hatush, M. Skitmore,“Contractor selection using multicriteria utility theory: an additive model”, Building and Environment, Vol. 33, No. 2-3, pp. 105-115, 1998 DOI: https://doi.org/10.1016/S0360-1323(97)00016-4
L. F. Alarcon, C. Mourgues, “Performance modeling for contractor selection”, Journal of Management in Engineering, Vol. 18, No. 2, pp. 52-60, 2002 DOI: https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(52)
E. K. Zavadskas, T. Vilutiene, “A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I—Model for maintenance contractor evaluation and the determination of its selection criteria”, Building and Environment, Vol. 41, No. 5, pp. 621-632, 2006 DOI: https://doi.org/10.1016/j.buildenv.2005.02.019
D. Singh, R. L. Tiong, “Contractor selection criteria: Investigation of opinions of Singapore construction practitioners”, Journal of Construction Engineering and Management, Vol. 132, No. 9, pp. 998-1008, 2006 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:9(998)
F. Waara, J. Brochner, “Price and nonprice criteria for contractor selection”, Journal of Construction Engineering and Management, Vol. 132, No. 8, pp. 797-804, 2006 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:8(797)
H. Doloi, “Analysis of pre-qualification criteria in contractor selection and their impacts on project success”, Construction Management and Economics, Vol. 27, No. 12, pp. 1245-1263, 2009 DOI: https://doi.org/10.1080/01446190903394541
G. V. Manideepak, A. Bhatla, B. Pradhan, “Methodologies for contractor selection in construction industry”, ACSGE-2009, BITS Pilani, India, October 25-27, 2009
D. J. Watt, B. Kayis, K. Willey, “The relative importance of tender evaluation and contractor selection criteria”, International Journal of Project Management, Vol. 28, No. 1, pp. 51-60, 2010 DOI: https://doi.org/10.1016/j.ijproman.2009.04.003
P. Jaskowski, S. Biruk, R. Bucon, “Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment”, Automation in Construction, Vol. 19, No. 2, pp. 120-126, 2010 DOI: https://doi.org/10.1016/j.autcon.2009.12.014
Z. Morkunaite, V. Podvezko, V. Kutut, “Selection criteria for evaluating contractors of cultural heritage objects”, Procedia Engineering, Vol. 208, pp. 90-97, 2017 DOI: https://doi.org/10.1016/j.proeng.2017.11.025
D. N. A. Ayettey, H. Danso, “Contractor selection criteria in Ghanaian construction industry: Benefits and challenges”, Journal of Building Construction and Planning Research, Vol. 6, pp. 278-297, 2018 DOI: https://doi.org/10.4236/jbcpr.2018.64019
Downloads
How to Cite
License
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.