Preliminary Survey on the Crucial Root Causes of Material Waste Generation in Malaysian Construction Industry

Authors

  • S. Nagapan Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • S. Kaliannan Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • A. H. Abdullah Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • S. Sohu Department of Civil Engineering, Quaid-e-Awam University College of Engineering, Science & Technology, Pakistan
  • R. Deraman Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • M. F. Hasmori Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • N. H. Abas Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
Volume: 8 | Issue: 6 | Pages: 3580-3584 | December 2018 | https://doi.org/10.48084/etasr.2388

Abstract

Construction waste generation has been perceived as a crucial issue that has critical consequences on the project effectiveness and ecological effect of the construction industry. The key objective of the current research is to identify the root causes of material construction waste generation in Malaysia. A well-structured questionnaire was designed based on the 52 identified root causes of material waste generation. The developed questionnaire was distributed to 35 highly experienced in Malaysian construction industry experts. The collected data was analyzed by the use of mean score analysis. The top identified root causes are poor supervision during the construction stage, lack of efficient site management, last minute changes, cutting uneconomical sizes of materials, and constant design changes during the construction period. The initial findings will aid construction practitioners to focus on these root causes in order to reduce the material construction waste generation at construction sites.

Keywords:

preliminary survey, material waste, root causes, environment, Malaysia

Downloads

Download data is not yet available.

References

S. Nagapan, I. A. Rahman, A. Asmi, “Construction waste management: Malaysian perspective”, International Conference on Civil and Environmental Engineering Sustainability, Johor Bahru, Malaysia, April 3-5, 2012

S. Ulubeyli, A. Kazaz, V. Arslan, “Construction and demolition waste recycling plants revisited: Management issues”, Procedia Engineering, Vol. 172, pp. 1190-1197, 2017 DOI: https://doi.org/10.1016/j.proeng.2017.02.139

S. Lockrey, H. Nguyen, E. Crossin, K. Verghese, “Recycling the construction and demolition waste in Vietnam: Opportunities and challenges in practice”, Journal of Cleaner Production, Vol. 133, pp. 757-766, 2016 DOI: https://doi.org/10.1016/j.jclepro.2016.05.175

A. P. Kern, F. M Dias, P. M. Kulakowski, “Waste generated in high- rise buildings construction: A quantification model based on statistical multiple regression”, Waste Management, Vol. 39, pp. 35-44, 2015 DOI: https://doi.org/10.1016/j.wasman.2015.01.043

M. Jain, “Economic aspects of construction waste materials in terms of cost savings – A case of Indian construction”, International Journal of Scientific and Research Publications, Vol. 2, No. 10, pp. 1-7, 2012

S. O. Ajayi, L. O. Oyedele, M. Bilal, O. O. Akinade, H. A. Alaka, H. A. Owolabi, K. O. Kadiri, “Waste effectiveness of the construction industry: understanding the impediments and requisites for improvements”, Resources, Conservation and Recycling, Vol. 102, pp. 101-112, 2015 DOI: https://doi.org/10.1016/j.resconrec.2015.06.001

D. Kulatunga, R. Amaratunga, R. Haigh, R. Rameezdeen, “Attitudes and perceptions of construction workforce on construction waste in Sri Lanka”, Management of Environmental Quality,Vol. 17, No.1, pp. 57-72, 2006 DOI: https://doi.org/10.1108/14777830610639440

A. Bakshan, I. Srour, G. Chehab, M. El-Fadel, “A field based methodology for estimating waste generation rates at various stages of construction projects”, Resources, Conservation and Recycling, Vol. 100, pp. 70-80, 2015 DOI: https://doi.org/10.1016/j.resconrec.2015.04.002

S. O. Ajayi, L. O. Oyedele, K. O. Kadiri, O. O. Akinade, M. Bilal, H. A. Owolabi, H. A. Alaka, “Competency-based measures for designing out construction waste: task and contextual attributes”, Engineering, Construction and Architectural Management, Vol. 23, No. 4, pp. 464-490, 2016 DOI: https://doi.org/10.1108/ECAM-06-2015-0095

L. Muhwezi, L. M. Chamuriho, N. M. Lema, “An investigation into materials wastes on building construction projects in Kampala-Uganda”, Journal of Engineering Research, Vol. 1, No. 1, pp. 11-18, 2012

R. A. Begum, S. K. Satari, J. J. Pereira, “Waste generation and recycling: Comparison of conventional and in-dustrialized building systems”, American Journal of Environmental Sciences, Vol. 6, No. 4, pp. 383-388, 2010 DOI: https://doi.org/10.3844/ajessp.2010.383.388

M. I. A. Rahim, N. Kasim, I. Mohamed, R. Zainal, N. Sarpin, M. Saikah, “Construction waste generation in Malaysian construction industry: illegal dumping activities”, IOP Conf. Series: Materials Science and Engineering, Vol. 271, No. 1, pp. 1-8, 2017

R. Ikau, C. Joseph, T. Tawie, “Factors influencing waste generation in the construction industry in Malaysia”, Procedia - Social and Behavioral Sciences, Vol. 234, pp. 11-18, 2016 DOI: https://doi.org/10.1016/j.sbspro.2016.10.213

S. H. Hassan, H. A. Aziz, M. N. Adlan, I. Johari, “The causes of waste generated in Malaysian housing construction sites using site observations and interviews”, International Journal of Environment and Waste Management, Vol. 15, No. 4, 295-308, 2015 DOI: https://doi.org/10.1504/IJEWM.2015.069960

S. A Dajadian, D. C. Koch, “Waste management models and their applications on construction sites”, International Journal of Construction Engineering and Management, Vol. 3, No. 3, pp. 91-98, 2014

T. Khaleel, A. Al-Zubaidy, “Major factors contributing to the construction waste generation in building projects of Iraq”, The 3rd International Conference on Buildings, Construction and Environmental Engineering, Egypt, October 23-25, 2017

J. D. Owalabi, L. M. Amusan, C. O. Oloke, O. Olusanya, P. Tunji-Olayeni, D. Owolabi, P. Joy, I. Omuh, “Causes and effect of delay on project construction delivery time”, International Journal of Education and Research, Vol. 2, No. 4, pp. 197-208, 2014

W. Yuan, C. Deng, H. Zhu, J. Li, “The statistical analysis and evaluation of examination results of materials research methods course”, Creative Education, Vol. 3, pp. 162-164, 2013 DOI: https://doi.org/10.4236/ce.2012.37B042

S. Alwi, K. Hampson, S. Mohamed, “Non value-adding activities in Australian construction projects”, International Conference on Advancement in Design, Construction, Construction Management and Maintenance of Building Structure, Bali, Indonesia, March 27-28, 2002

E. M. Nazech, D. Zaldi, B. Trigunarsyah, “Identification of construction waste in road and highway construction projects”, The 11th East Asia-Pacific Conference on Engineering and Construction, Taipei, Taiwan, November 19-21, 2008

S. G. Dalibi, “Resultant effects of poor supervision in construnction projects in Nigeria”, 6th Building and Construction Economic Round Table, Abuja FCT, Nigeria, July 14-15, 2016

C. T. Formoso, L. Soibelman, C. De Cesare, E. L. Isatto, “Material waste in building industry: Main causes and prevention”, Journal of Construction Engineering and Management, Vol. 128, No. 4, pp. 316-325, 2002 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(316)

G. Polat, A. Damci, H. Turkoglu, A. P. Gurgun, “Identification of root causes of construction and demolition waste: The case of Turkey”, Procedia Engineering, Vol. 196, pp. 948-955, 2017 DOI: https://doi.org/10.1016/j.proeng.2017.08.035

A. B. Wahab, A. F. Lawal, “An evaluation of waste control measures in construction industry in Nigeria”, African Journal of Environmental Science and Technology, Vol. 5, No. 3, pp. 246-254, 2011

Y. Zhao, D. K. H. Chua, “Relationship between productivity and non value-adding activities”, 11th Annual Conference of the International Group for Lean Construction, Blacksburg, Virginia, USA, 2003

W. Lu, H. Yuan, “A framework for understanding waste management studies in construction”, Waste Management, Vol. 31, No. 6, pp. 1252-1260, 2011 DOI: https://doi.org/10.1016/j.wasman.2011.01.018

X. Wang, P. Kang, V. W. Y. Tam, “An investigation of construction wastes: an empirical study in Shenzhen”, Journal of Engineering, Design and Technology, Vol. 6 No. 3, pp. 227-236, 2008 DOI: https://doi.org/10.1108/17260530810918252

A. F. Urio, A. C. Brent, “Solid waste management strategy in Botswana: The reduction of construction waste”, Journal of the South African Institution of Civil Engineering, Vol. 48, pp. 18-22, 2006

M. Osmani, J. Glassand A. D. Price, “Architects perspectives on construction waste minimisation by design”, Waste Management, Vol. 28, No. 7, pp. 1147-1158, 2008 DOI: https://doi.org/10.1016/j.wasman.2007.05.011

C. S. Poon, A. T. W. Yu, S. W. Wong, E. Cheung “Management of construction waste in public housing projects in Hong Kong”, Construction Management and Economics, Vol. 22, No. 7, pp. 675-689, 2004 DOI: https://doi.org/10.1080/0144619042000213292

G. A. Bekr, “Study of the causes and magnitude of wastage of materials on construction sites in Jordan”, Journal of Construction Engineering, Vol. 2014, ArticleID 283298, 2014 DOI: https://doi.org/10.1155/2014/283298

B. Nikmehr, M. R. Hosseini, M. Oraee, N. Chileshe, “Major factors affecting waste generation on construction sites in Iran”, 6th International Conference on Engineering, Project, and Production Management, Gold Coast, Australia, September 1-4, 2015 DOI: https://doi.org/10.32738/CEPPM.201509.0051

T. O. Adewuyi, I. A. Odesola, “Factors affecting material waste on construction sites in Nigeria”, Journal of Engineering and Technology, Vol. 6, No. 1, pp. 82-99, 2015

O. O. Fadiya, P. Georgakis, E. Chinyio, “Quantitative analysis of the sources of construction waste”, Journal of Construction Engineering, Vol. 2014, ArticleID 651060, 2014 DOI: https://doi.org/10.1155/2014/651060

L. Y. Tam, I. W. Shen, H. Fung, J. Y. Wang, “Controlling construction waste by implementing govern-mental ordinances in Hong Kong”, Journal of Construction Innovation, Vol. 7, No. 2, pp. 149-166, 2007 DOI: https://doi.org/10.1108/14714170710738522

L. Ekanayake, G. Ofori, “Construction material waste source evaluation, proceedings: Strategies for a sustainable built environment”, Strategies for a Sustainable Built Environment, Pretoria, South Afrika, August, 2000

R. A Garas, Anis, E. A. Gammal, “Material waste in the Egyptian construction industry”, 9th Annual Conference of the International Group for Lean Construction, National University of Singapore, Singapore, 2001

M. S. Pakhare, A. B. More, N. V. Bhalerao, “To Identify the root causes for wastages of construction materials”, International Journal of Advance Research and Innovative Ideas in Education, Vol. 3, No. 4, pp. 2137-2139, 2017

S. Senaratne, D. Wijesiri, “Lean Construction as a strategic option: testing its suitability and acceptability in Sri Langka”, Lean Construction Journal, Vol. 2008, pp. 34-48, 2008

The Star Online, “Govt Scraps MRT 3 Project”, available at https://www.thestar.com.my/news/nation/2018/05/31/govt-scraps-mrt-3-project-pm-we-must-reduce-our-borrowings, 2018

Downloads

How to Cite

[1]
Nagapan, S., Kaliannan, S., Abdullah, A.H., Sohu, S., Deraman, R., Hasmori, M.F. and Abas, N.H. 2018. Preliminary Survey on the Crucial Root Causes of Material Waste Generation in Malaysian Construction Industry. Engineering, Technology & Applied Science Research. 8, 6 (Dec. 2018), 3580–3584. DOI:https://doi.org/10.48084/etasr.2388.