Contributing Factors of Time Overrun in Public Sector Construction Projects

Authors

  • M. A. Akhund Department of Civil Engineering, ISRA University, Hyderabad, Pakistan
  • H. U. Imad Department of Civil Engineering, ISRA University, Hyderabad, Pakistan
  • N. A. Memon Department of Civil Engineering, Mehran University of Engineering & Technology, Jamshoro, Pakistan
  • F. Siddiqui Department of Civil Engineering, Mehran University of Engineering & Technology, Jamshoro, Pakistan
  • A. R. Khoso Department of Civil Engineering, Mehran University of Engineering & Technology, Jamshoro, Pakistan
  • A. A. Panhwar Sindh Irrigation Department, Sindh, Pakistan
Volume: 8 | Issue: 5 | Pages: 3369-3372 | October 2018 | https://doi.org/10.48084/etasr.2276

Abstract

Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.

Keywords:

time overrun, construction industry, public sector

Downloads

Download data is not yet available.

References

D. M. Leishman, “Protecting engineer against construction delay claims NDC”, Journal of Management in Engineering, Vol. 7, No. 3, pp. 314-333, 1991 DOI: https://doi.org/10.1061/(ASCE)9742-597X(1991)7:3(314)

A. U. Elinwa, M. Joshua, “Time-overrun factors in the Nigerian construction industry”, Journal of Construction Engineering and Management, Vol. 127, No. 5, pp. 419-425, 2001 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(419)

M. Abd El-Razek, H. Bassioni, A. Mobarak, “Causes of Delay in Building Construction: Projects in Egypt”, Journal of Construction Engineering And Management, Vol. 134, No. 11, pp. 831-841, 2008 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831)

R. Hassan, A. M. S. Suliman, A. Y. Malki, “An Investigation into the Delays in Road Projects in Bahrain”, International Journal of Research in Engineering and Science, Vol. 2, No. 2, pp. 38-47, 2014

E. G. Sinesilassie, S. Z. S. Tabish, K. N. Jha, “Critical factors affecting schedule performance: A case of Ethiopian public construction projects–engineers’ perspective”, Engineering, Construction and Architectural Management, Vol. 24, No. 5, pp. 757-773, 2017

N. Ejaz, I. Ali, M. F. Tahir, “Assessment of delays and cost overruns during construction projects in Pakistan”, available at: http://dl.lib.mrt.ac.lk/handle/123/9431, 2013

S. Meepol, S. O. Ogunlana, “Factors affecting cost and time performance on highway construction projects: evidence from Thailand”, Journal of Financial Management of Property and Construction, Vol. 11, No. 1, pp. 3-20, 2006 DOI: https://doi.org/10.1108/13664380680001076

D. W. Chan, M. M. Kumaraswamy, “A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects”, International Journal of Project Management, Vol. 15, pp. 55-63, 1997 DOI: https://doi.org/10.1016/S0263-7863(96)00039-7

A. A. Aibinu, G. O. Jagboro, “The effects of Construction Delays on Project Delivery in the Nigerian Construction Industry”, International Journal of Project Management, Vol. 20, pp. 593-599, 2002 DOI: https://doi.org/10.1016/S0263-7863(02)00028-5

M. Sambasivan, Y. W. Soon, “Causes and Effects of Delays in Malaysian Construction Industry”, International Journal of Project Management, Vol. 25, pp. 517-526, 2007 DOI: https://doi.org/10.1016/j.ijproman.2006.11.007

I. Mohammid “Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective”, Australasian Journal of Construction Economics and Building, Vol. 13, No. 2, pp. 45-53, 2013 DOI: https://doi.org/10.5130/AJCEB.v13i2.3194

R. F. Aziz, “Ranking of Delay Factors in Construction Projects After the Egyptian Revolution”, Alexandria Engineering Journal, Vol. 52, pp. 387-406, 2013 DOI: https://doi.org/10.1016/j.aej.2013.03.002

A. Upadhyay, V. Gupta, M. Pandey, “A case study on schedule delay analysis in construction projects in Gwalior”, International Research Journal of Engineering and Technology, Vol. 3, No. 5, pp. 1312-1315, 2016

D. Kumar, “Causes and Effects of Delays in Indian Construction Projects”, International Research Journal of Engineering and Technology, Vol. 3, No. 4, pp. 1831-1837, 2016

M. Murray, M. Seif, “Causes of project delays in the Nigerian construction industry”, European Journal of Civil Engineering and Architecture, Vol. 10, pp. 1-7, 2013

J. K. Shah, R. M. Apte, “Causes of Delay in Construction of Bridge Girders”, Journal of Mechanical and Civil Engineering, Vol. 12, No. 1, pp. 8-12, 2015

C. B. Venkateswaran, R. Murugasan, “Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India”, Journal of Construction in Developing Countries, Vol. 22, pp. 79-96, 2017 DOI: https://doi.org/10.21315/jcdc2017.22.supp1.5

E. G. Sinesilassie, S. Z. S., Tabish, K. N. Jha, “Critical factors affecting schedule performance: A case of Ethiopian public construction projects–engineers’ perspective”, Engineering, Construction and Architectural Management, Vol. 24, No. 5, pp. 757-773, 2017 DOI: https://doi.org/10.1108/ECAM-03-2016-0062

Y. J. T. Zidane, B. Andersen, “The top 10 universal delay factors in construction projects”, International Journal of Managing Projects in Business, Vol. 11, No. 3, pp. 650-672, 2018 DOI: https://doi.org/10.1108/IJMPB-05-2017-0052

M. A. Akhund, A. R. Khoso, U. Memon, S. H. Khahro, “Time Overrun in Construction Projects of Developing Countries”, Imperial Journal of Interdisciplinary Research, Vol. 3, No. 5, pp. 124-129, 2017

M. Akram, T. H. Ali, N. A. Memon, S. H. Khahro, “Causal Attributes of Cost Overrun In Construction Projects of Pakistan”, International Journal of Civil Engineering and Technology, Vol. 8, No. 6, pp. 477-483, 2017

Downloads

How to Cite

[1]
M. A. Akhund, H. U. Imad, N. A. Memon, F. Siddiqui, A. R. Khoso, and A. A. Panhwar, “Contributing Factors of Time Overrun in Public Sector Construction Projects”, Eng. Technol. Appl. Sci. Res., vol. 8, no. 5, pp. 3369–3372, Oct. 2018.

Metrics

Abstract Views: 1623
PDF Downloads: 647

Metrics Information

Most read articles by the same author(s)

1 2 > >>