A Study on the Enhancement of the Large-Scale Construction Project Capability of Project Management Boards
Received: 25 January 2024 | Revised: 18 February 2024 | Accepted: 21 February 2024 | Online: 29 March 2024
Corresponding author: Tuan Anh Nguyen
Abstract
This article analyzes the data collected from the general public and experts in the industry in order to assess the current situation and propose solutions to improve the capability of project management boards of large-scale construction projects in Vietnam. A dataset of 129 survey respondents, whose reliability has been validated with the Cronbach's alpha and the Exploratory Factor Analysis (EFA) test, was constructed. The remaining 24 factors were organized into 8 factor groups that influence the project management capability. Group I, which had the greatest impact, is the legal procedures group, followed by the project deployment process group, down to Group VIII, which is the project risk management group. The results of this study help large-scale construction companies find effective solutions to improve the quality of their projects and increase their competitive capacity in the domestic and international markets.
Keywords:
project management capability, solutions, project quality, large-scale construction projects, project management boardDownloads
References
D. D. Duc, Management of construction investment projects. Hanoi, Vietnam: Hanoi Publishing House, 2012.
ISO 21505:2017. Project, programme and portfolio management. ISO, 2017.
ISO 21502:2020. Project, programme and portfolio management. ISO, 2020.
ISO 21500:2021. Project, programme and portfolio management. ISO, 2017.
P. M. Institute, A Guide to the Project Management Body of Knowledge, 7th ed. Newtown Square, PA, USA: Project Management Institute, 2021.
Construction Law No. 50/2014/QH13. The Socialist Republic of Vietnam, 2014.
C. P. Pham, P. T. Nguyen, and P. T. Phan, "Application of the Grey System Theory in Construction Management: A Case Study of Construction Paint Supplier Evaluation and Selection Criteria," Engineering, Technology & Applied Science Research, vol. 12, no. 5, pp. 9087–9091, Oct. 2022.
P. T. Nguyen and P. C. Nguyen, "Risk Management in Engineering and Construction: A Case Study in Design-Build Projects in Vietnam," Engineering, Technology & Applied Science Research, vol. 10, no. 1, pp. 5237–5241, Feb. 2020.
H. Maniam, S. Nagapan, A. H. Abdullah, S. Subramaniam, and S. Sohu, "A Comparative Study of Construction Waste Generation Rate Based on Different Construction Methods on Construction Project in Malaysia," Engineering, Technology & Applied Science Research, vol. 8, no. 5, pp. 3488–3491, Oct. 2018.
V. V. Thang, "Proposing solutions to improve project management capacity for the Construction Investment Project Management Board of Phu Ly city, Ha Nam," M. S. thesis, Thuyloi University, Hanoi, Vietnam, 2019.
T. N. Anh, "Researching solutions to improve project management capacity at the Economic Zone Construction Investment Project Management Board of Quang Binh province," M. S. thesis, Thuyloi University, Hanoi, Vietnam, 2019.
N. T. Trung, "Researching solutions to improve project management capacity at the Capital Construction Investment Project Management Board - Binh Thuan Rural Development Department," M. S. thesis, Thuyloi University, Hanoi, Vietnam, 2019.
T. M. Ho, "Propose some solutions to improve the Consulting capacity of Cong Hoa Construction Company Limited," M. S. thesis, Thuyloi University, Hanoi, Vietnam, 2019.
A. Shtub and M. Rosenwein, Project Management: Processes, Methodologies, and Economics, 3rd ed. Boston, MA, USA: Pearson, 2016.
G. Oberlender, G. Spencer, and R. M. Lewis, Project Management for Engineering and Construction: A Life-Cycle Approach, Fourth Edition, 4th ed. New York, NY, USA: McGraw Hill, 2022.
H. A. Sulieman and F. A. Alfaraidy, "Influences of Project Management Capabilities on the Organizational Performance of the Saudi Construction Industry," Engineering, Technology & Applied Science Research, vol. 9, no. 3, pp. 4144–4147, Jun. 2019.
H. Trong, Applied statistics in socio-economics. Hanoi, Vietnam: Social Labor Publishing House, 2008.
J. F. H. Jr, W. C. Black, B. J. Babin, and R. E. Anderson, Multivariate Data Analysis, 7th ed. Upper Saddle River, NJ, USA: Pearson, 2009.
H. M. Thao, "Solutions to enhance the project management capability of the Van Phuc City Project Management Board," M. S. thesis, Ho Chi Minh City University of Transport, Ho Chi Minh City, Vietnam, 2022.
Downloads
How to Cite
License
Copyright (c) 2024 The Van Tran, Tuan Anh Nguyen, Thao Minh Hoang
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.