Assessing the Risk Level of the Challenges Faced In Construction Projects

Authors

  • A. Alameri Faculty of Business and Technology Management, Universiti Tun Hussein Onn Malaysia, Malaysia
  • A. S. A. M. Alhammadi Faculty of Business and Technology Management, Universiti Tun Hussein Onn Malaysia, Malaysia
  • A. H. Memon Department of Civil Engineering, Quaid-e-Awam University of Engineering Science and Technology, Nawabshah, Pakistan
  • I. A. Rahman Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, Malaysia
  • N. A. N. Nasaruddin Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, Malaysia

Abstract

The failure of construction projects could be attributed to several challenges that emerged during the construction process. Nine major challenges were uncovered from the literature: resource allocation, time, cost, quality, safety, project complexity, changes, uncertainties, and communication. A survey was carried out among professionals having a minimum of 10 years of experience in the construction industry to identify the occurrence and severity of these challenges. A total of 117 responses were analyzed and plotted on a risk matrix. The mean values indicated that time, cost, and quality are the top three challenges faced in construction projects, while the risk matrix revealed that all challenges are high-risk challenges. Thus, the professionals should consider suitable measures to address these challenges for improving a project’s performance.

Keywords:

construction industry, construction challenges, risk, risk matrix, Malaysia

Downloads

Download data is not yet available.

References

R. Udhayakumar and D. P. Karthikeyan, "Expected Leadership Qualities for a Project Manager to Manage Construction Projects," International Journal of Innovative Research and Development, vol. 3, no. 10, Oct. 2014.

M. Jain and K. K. Pathakx, "Critical Factors Affecting the Success of a Construction Projects: A Review," Asian Journal of Educational Research and Technolog, vol. 4, no. 2, pp. 420–426, 2014.

R. Morton and A. Ross, Construction UK: Introduction to the Industry, 2nd edition. Oxford ; Malden, MA: Wiley-Blackwell, 2007.

A. P. C. Chan, D. C. K. Ho, and C. M. Tam, "Design and Build Project Success Factors: Multivariate Analysis," Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93–100, Apr. 2001. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(93)

A. S. Ali and I. Rahmat, "The performance measurement of construction projects managed by ISO-certified contractors in Malaysia," Journal of Retail & Leisure Property, vol. 9, no. 1, pp. 25–35, Feb. 2010. DOI: https://doi.org/10.1057/rlp.2009.20

Y. Singh, T. Abdelhamid, T. Mrozowski, and M. A. El-Gafy, "Investigation of Contemporary Performance Measurement Systems for Production Management of Renovation Projects," Journal of Construction Engineering, vol. 2014, Jul. 2014, Art. no. e417853. DOI: https://doi.org/10.1155/2014/417853

A. Enshassi, "Factors Affecting Safety on Construction Projects," Islamic University of Gaza, Gaza Strip, Palestine, 2003, Accessed: Apr. 23, 2021. [Online]. Available: https://iugspace.iugaza.edu.ps/handle/20.500.12358/26611.

G. John and A. Ganah, "Integrating BIM and Planning Software for Health and Safety Site Induction," presented at the COBRA 2011, The Royal Institution of Chartered Surveyors International Research Conference, University of Salford, UK, Sep. 2011.

J. Wanberg, C. Harper, M. R. Hallowell, and S. Rajendran, "Relationship between Construction Safety and Quality Performance," Journal of Construction Engineering and Management, vol. 139, no. 10, Oct. 2013, Art. no. 04013003. DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000732

A. S. Ali and S. N. Kamaruzzaman, "Cost performance for building construction projects in Klang valley," Journal of Building Performance, vol. 1, no. 1, pp. 110–118, 2010.

W. H. N. W. Muda, W. H. Libunao, K. M. Salleh, and & N. Sulaiman, "Developing a Leadership Capability for Team Leaders in the Construction Industry: A Concept for Organizational Success," Journal of Technical Education and Training, vol. 8, no. 2, Dec. 2016.

R. B. Isa, R. A. Jimoh, and E. Achuenu, "An overview of the contribution of construction sector to sustainable development in Nigeria," Net Journal of Business Management, vol. 1, no. 1, pp. 1–6, Nov. 2013.

S. T. Ng, R. M. Skitmore, K. C. Lam, and A. W. C. Poon, "Demotivating factors influencing the productivity of civil engineering projects," International Journal of Project Management, vol. 22, no. 2, pp. 139–146, Feb. 2004. DOI: https://doi.org/10.1016/S0263-7863(03)00061-9

M. Yadollahi, M. Mirghasemi, R. Mohamad Zin, and B. Singh, "Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study," Advances in Civil Engineering, vol. 2014, Aug. 2014, Art. No. e205310. DOI: https://doi.org/10.1155/2014/205310

B. Muir, "Challenges Facing Today’s Construction Manager," University of Delaware, Supplemental Reading for CIEG 486-010 Construction Methods & Management, 2005.

A. A. E. Othman, "Challenges of mega construction projects in developing countries," Organization, Technology and Management in Construction - An International Journal, vol. 5, no. 1, pp. 730–746, 2013. DOI: https://doi.org/10.5592/otmcj.2013.1.10

D. Q. Tran, M. R. Hallowell and K. R. Molenaar, "Construction management challenges and best practices for rural transit projects," Journal of Management in Engineering, vol. 31, no. 5, 2014 DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000297

Y. H. Chan, B. C. T. Lee, and J. C. Lee, "Sustainability in the Construction Industry in Malaysia: The Challenges and Breakthroughs," International Journal of Economics and Management Engineering, vol. 8, no. 4, pp. 1218–1222, Aug. 2014.

A. R. Nuruddin, S. P. S. A. Bakar, and M. Jaafar, "Unveiling the Challenges Faced By Malaysian Housing Developers through Government Policy Changes," Journal of Construction in Developing Countries, vol. 20, no. 2, pp. 37–52, 2015.

P. U. Okoye, C. Ngwu, and S. C. Ugochukwu, "Evaluation of management challenges facing constructino practice in Nigeria," International Journal of Application or Innovation in Engineering & Management, vol. 4, no. 1, pp. 19–28, Jan. 2015.

K. Subramanyam and M. K. Haridharan, "Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective," IOP Conference Series: Earth and Environmental Science, vol. 80, Jul. 2017, Art. no. 012045. DOI: https://doi.org/10.1088/1755-1315/80/1/012045

M. S. Kiu, S. R. Mehdi Riazi, M. N. Mohd Nawi, and M. Esa, "The roles, challenges & improvement of project manager in project financial management in building development in Penang, Malaysia," International Journal of Supply Chain Management (IJSCM), vol. 6, no. 1, pp. 238–245, Mar. 2017.

B. N. Azmi, A. Hamimah, and I. Azmi, "Construction claim problems in Malaysia: from the contractors perspective," MATEC Web of Conferences, vol. 192, 2018, Art. no. 02004. DOI: https://doi.org/10.1051/matecconf/201819202004

C. Hendrickson and T. Au, Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders, Facsimile edition. Englewood Cliffs, N.J: Prentice-Hall, 1989.

A. Laskar and V. R. Murty, "Challenges before Construction Industry in India," Department of Civil Engineering, Indian Institute of Technology Kanpur, 2004.

T. Ala-Risku and M. Kärkkäinen, "Material delivery problems in construction projects: A possible solution," International Journal of Production Economics, vol. 104, no. 1, pp. 19–29, Nov. 2006. DOI: https://doi.org/10.1016/j.ijpe.2004.12.027

A. C. S. Dudgikar, E. M. B. Kumthekar, and E. S. R. Khot, "Development of ERP Module for Quality Management in Construction Industry," International Journal of Electronics and Communications, vol. 1, no. 1, Aug. 2012, Art. no. 12.

A. O. Sanni and M. Hashim, "Assesing the chalenges of cost control practices in Nigerian construction industry," Interdisciplinary Journal of Contemporary Research in Business, vol. 4, no. 9, Jan. 2013, Art. no. 9.

S. Chukwudi and T. Onyekwena, "Participation of indigenous contractors in Nigerian public sector projects and their challenges in managing working capital," International Journal of Civil Engineering, Construction and Estate Management, vol. 1, no. 1, Mar. 2014, Art. no. 23.

A. Al-Kharashi and M. Skitmore, "Causes of delays in Saudi Arabian public sector construction projects," Construction Management and Economics, vol. 27, no. 1, pp. 3–23, Jan. 2009. DOI: https://doi.org/10.1080/01446190802541457

A. H. Memon, I. A. Rahman, M. R. Abdullah, and A. A. A. Azis, "Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant," International Journal of Sustainable Construction Engineering and Technology, vol. 1, no. 2, pp. 41–54, 2010. DOI: https://doi.org/10.22452/jscp.vol2no1.4

K. A. Mohammed and A. D Isah, "Causes of delay in Nigeria construction industry," Interdisciplinary Journal of Contemporary Research in Business, vol. 4, no. 2, pp. :785-94, 2012

A. Q. Memon, A. H. Memon, and M. A. Soomro, "Contractor’s Perception on Factors Causing Cost Overrun in Construction Works of Pakistan," International Journal of Sustainable Construction Engineering and Technology, vol. 11, no. 3, pp. 84–92, Dec. 2020. DOI: https://doi.org/10.30880/ijscet.2020.11.03.009

S. Ogunlana, Z. Siddiqui, S. Yisa, and P. Olomolaiye, "Factors and procedures used in matching project managers to construction projects in Bangkok," International Journal of Project Management, vol. 20, no. 5, pp. 385–400, Jul. 2002. DOI: https://doi.org/10.1016/S0263-7863(01)00017-5

A. Omoregie and D. Radford, "Infrastructure delays and cost escalation: Causes and effects in Nigeria," in Proceedings ofthe 6th International Postgraduate Research Conference in the Built and Human Environment, Delft, Netherlands, Apr. 2006.

B. Chigara, T. Moyo, and F. H. Mudzengerere, "An Analysis of Cost Management Strategies Employed By Building Contractors on Projects in Zimbabwe," International Journal of Sustainable Construction Engineering and Technology, vol. 4, no. 2, pp. 1–13, Nov. 2013.

M. S. A. Halim, M. S. M. Haniff, M. Z. M. Junoh, and A. Osman, "Financial Performance and the Management Issues of Bumiputera Construction Firms in the Malaysian Construction Industry," Journal of Scientific Research and Reports, pp. 1190–1202, Mar. 2014. DOI: https://doi.org/10.9734/JSRR/2014/8418

A. S. A. M. Alhammadi and A. H. Memon, "Inhibiting Factors of Cost Performance in UAE Construction Projects," International Journal of Sustainable Construction Engineering and Technology, vol. 11, no. 2, pp. 126–132, Oct. 2020. DOI: https://doi.org/10.30880/ijscet.2020.11.02.014

P. Hoonakker, P. Carayon, and T. Loushine, "Barriers and benefits of quality management in the construction industry: An empirical study," Total Quality Management & Business Excellence, vol. 21, no. 9, pp. 953–969, Sep. 2010. DOI: https://doi.org/10.1080/14783363.2010.487673

A. H. Memon et al., "Risk Level of the Factors Affecting the Quality of Construction Projects in Pakistan," Indian Journal of Science and Technology, vol. 11, no. 48, pp. 1–8, Dec. 2018. DOI: https://doi.org/10.17485/ijst/2018/v11i48/131226

K. Dorji and B. H. W. Hadikusumo, "Safety Management Practices in the Bhutanese Construction Industry," Journal of Construction in Developing Countries, vol. 11, no. 2, pp. 53–75, 2006.

G. Muiruri, "Health and safety management on construction project sites in Kenya: a case of construction projects in Nairobi County," M.S. thesis, University of Nairobi, Kenya, 2012.

H. Wood and K. Gidado, "Project Complexity in Construction," in COBRA 2008 - Construction and Building Research Conference of the Royal Institution of Chartered Surveyors, Jan. 2008.

Z. Shehu and A. Akintoye, "Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis," International Journal of Project Management, vol. 28, no. 1, pp. 26–39, Jan. 2010. DOI: https://doi.org/10.1016/j.ijproman.2009.02.004

I. Motawa, "A Systematic Approach to Modelling Change Processes in Construction Projects," Construction Economics and Building, vol. 5, no. 1, pp. 23–31, 2005. DOI: https://doi.org/10.5130/AJCEB.v5i1.2940

Q. Hao, W. Shen, J. Neelamkavil, and R. Thomas, "Change management in construction projects," presented at the International Conference on Information Technology in Construction, Santiago, Chile, Jul. 2008.

J. E. Okema, "Risk and Uncertainty Management of Projects: Challenges of Construction Industry," presented at the 2nd International Conference on Construction in Developing Countries: Challenges Facing the Construction Industry in Developing Countries, Gaborone, Botswana, Nov. 2000.

M. Rahman and M. Kumaraswamy, "Revamping risk management in Hong Kong construction industry," in Proceedings of the RICS Foundation - Construction & Building research Conference (COBRA 2001), Glascow, UK, Sep. 2001.

N. Banaitiene and A. Banaitis, "Risk Management in Construction Projects," in Risk Management - Current Issues and Challenges, Intech: Rijeka, Croatia, pp. 429–448.

M. Hoezen, I. Reymen, and G. Dewulf, "The problem of communication in construction," presented at the CIB W96 Adaptable Conference, Enschede, Netherlands, Jul. 2006.

B. Sidawi, "Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company," Journal of Engineering, Project, and Production Management, vol. 2, no. 1, pp. 14–22, Jan. 2012. DOI: https://doi.org/10.32738/JEPPM.201201.0003

F. Emuze and M. James, "Exploring communication challenges due to language and cultural diversity on South African construction sites," Acta Structilia, vol. 20, no. 1, pp. 44–65, Sep. 2013.

A. Zin, A. Memon, and R. Mohamad zin, "Comparative Study of Resource Scheduling with Primavera Project Planner and Microsoft Project," in SEPKA 2006 - National Seminar on Civil Engineering Research, Johor, Malaysia, Dec. 2006.

A. Hameed, "Resource-driven scheduling: barriers to implementation," M.S. thesis, University Teknologi Malaysia, 2005.

S. M. Patil, D. B. Desai, and A. K. Gupta, "Earned value analysis in construction industry," International Journal of Informative & Futuristic Research, no. Special, pp. 19–26, Mar. 2015.

M. A. Akhund, A. R. Khoso, A. A. Pathan, H. U. Imad, and F. Siddiqui, "Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan," Engineering, Technology & Applied Science Research, vol. 8, no. 4, pp. 3260–3264, Aug. 2018. DOI: https://doi.org/10.48084/etasr.2203

M. M. A. El Al Kass, "A Construction Resources Management System for Gaza Strip Building Contractors," M.S. thesis, Islamic University of Gaza, Gaza, Palestine, 2012.

S. Rowlinson, Cost escalation in the Hong Kong construction industry report. Hong Kong, China: The University of Hong Kong, 2014.

K. S. Kumari, "A Study On Resource Planning In Highway Construction Projects," International Journal of Engineering Research and, vol. 2, pp. 1960–1967, 2012.

S. Ahmed, A. H. Memon, N. A. Memon, A. N. Laghari, M. A. Akhund, and H. U. Imad, "Common Factors of Cost Escalation in Construction Industry of Pakistan," Engineering, Technology & Applied Science Research, vol. 8, no. 6, pp. 3508–3511, Dec. 2018. DOI: https://doi.org/10.48084/etasr.2278

D. Arditi and H. M. Gunaydin, "Total quality management in the construction process," International Journal of Project Management, vol. 15, no. 4, pp. 235–243, Aug. 1997. DOI: https://doi.org/10.1016/S0263-7863(96)00076-2

A. A. Bubshait and T. H. Al-Atiq, "ISO 9000 Quality Standards in Construction," Journal of Management in Engineering, vol. 15, no. 6, pp. 41–46, Nov. 1999. DOI: https://doi.org/10.1061/(ASCE)0742-597X(1999)15:6(41)

N. U. I. Soomro, A. H. Memon, N. A. Memon, and K. R. Memon, "Contractor’s Selection Criteria in Construction Works in Pakistan," Engineering, Technology & Applied Science Research, vol. 10, no. 2, pp. 5520–5523, Apr. 2020. DOI: https://doi.org/10.48084/etasr.3334

M. Saïdani, "Health and Safety in the construction industry: Challenges and solutions in UAE," presented at the Third International World of Construction Project Management Conference, Coventry University, UK, Jan. 2010.

E. M. K. Ghani, E. D. Z. B. A. Hamid, E. M. Z. M. Zain, E. A. H. A. R. Rahim, E. K. A. M. Kamar, and M. A. A. Rahman, "Safety in Malaysian Construction: The Challenges and Initiatives," JURUTERA, pp. 16–19, May 2008.

R. F. Fellows and A. M. M. Liu, Research Methods for Construction, 4th ed. Hoboken, NJ, USA: John Wiley & Sons, 2015.

C. Brockmann, "Evaluating Construction Project Complexity," in Management of Construction: Research to Practice (MCRP) Conference Proceedings, Joint CIB International Symposium of W055, W065, W089, W118, TG76, TG78, TG81 and TG84, Montreal, Canada, 2012, pp. 716–727.

D. Lazarus and R. Clifton, Managing Project Change - A Best Practice Guide: A Best Practice Guide C556. London: Construction Industry Research & Information Association, 2001.

J. J. Egan, J. E. Seder, and D. L. Anderson, "Practices in Construction Change Order Management," Cost Engineering, Apr. 2012.

B.-G. Hwang and L. K. Low, "Construction project change management in Singapore: Status, importance and impact," International Journal of Project Management, vol. 30, no. 7, pp. 817–826, Oct. 2012. DOI: https://doi.org/10.1016/j.ijproman.2011.11.001

H. Wood and P. Ashton, "The factors of project complexity," in 18th CIB World Building Congress, Jan. 2010, pp. 69–80.

M. Mentis, "Managing project risks and uncertainties," Forest Ecosystems, vol. 2, no. 1, Jan. 2015, Art. no. 2, DOI: https://doi.org/10.1186/s40663-014-0026-z

S. Lichtenberg, "The Successive Principle–a scientific crystal ball for management," The IPSI BgD Transactions on Internet Research, vol. 2, no. 1, pp. 33–39, Jul. 2006.

L. G. Tipili, P. O. Ojeba, and M. S. Ilyasu, "Evaluating the effects of communication in construction project delivery in Nigeria," Global Journal of Environmental Science and Technology, vol. 2, no. 5, pp. 48–54, Jun. 2014.

N. A. Weiss, Elementary Statistics, 8th edition. Boston, MA, USA: Pearson, 2011.

I. Mahamid, "Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective," Australasian Journal of Construction Economics and Building, The, Jan. 2013. DOI: https://doi.org/10.5130/AJCEB.v13i2.3194

M. Tavakol and R. Dennick, "Making sense of Cronbach’s alpha," International Journal of Medical Education, vol. 2, pp. 53–55, Jun. 2011. DOI: https://doi.org/10.5116/ijme.4dfb.8dfd

A. Yahaya, s Haslim, J. Ramli, Y. Boon, and A. R. Hamdan, Menguasai Penyelidikan Dalam Pendidikan: Teori, Analisis & Interpretasi Data. Kuala Lumpur, Malaysia: PTS Professional, 2007.

I. A. Rahman, A. H. Memon, A. Q. Memon, M. A. Shaikh, and F. Siddiqui, "Reasons of poor labour productivity in construction works," Malaysian Construction Research Journal, vol. 8, no. 3, 2019.

N. A. Nasaruddin, I. A. Rahman, and M. M. Jaber, "PLS-SEM Model of Leadership Characteristics facing Challenges in Malaysia Construction Industry," International Journal of Engineering & Technology, vol. 7, pp. 620–624, 2018.

Downloads

How to Cite

[1]
A. Alameri, A. S. A. M. Alhammadi, A. H. Memon, I. A. Rahman, and N. A. N. Nasaruddin, “Assessing the Risk Level of the Challenges Faced In Construction Projects”, Eng. Technol. Appl. Sci. Res., vol. 11, no. 3, pp. 7152–7157, Jun. 2021.

Metrics

Abstract Views: 2145
PDF Downloads: 1029

Metrics Information

Most read articles by the same author(s)