Developing a Program for Practice Management and Productivity Improvement of Infrastructure Projects by using Business Information Modeling
Received: 24 April 2024 | Revised: 5 May 2024 | Accepted: 8 May 2024 | Online: 2 August 2024
Corresponding author: Saja Abd Alrazaq Khamees
Abstract
The employment of Business Information Modeling (BIM) may assist the resident engineering department in reaching its long-term strategic goals. The suggested computer software was created and tested using the first package of new projects for roads, bridges, and tunnels aimed at solving the traffic congestion crisis taking place in the capital city of Iraq, Baghdad. In the context of the current study, questionnaires and personal interviews with specialists in the field of road, tunnel, and overpass construction were employed. The aim of implementing BIM is to assess the introduced program’s efficiency, verify its performance, and identify any errors, defects, or challenges that users may encounter during its application. The computer program underwent successful testing at several Resident Engineer's Offices (REOs) within the initial package of new projects aimed at addressing traffic congestion issues in Baghdad through independent verification checks. Initially, the program was utilized with the assistance of a user guide to facilitate its operation and provide a detailed description of each program feature which can provide effective decision-making and enhance REOs' computer skills.
Keywords:
Business Information Modeling (BIM), Resident Engineer's Offices (REOs), productivity improvement, decision-makingDownloads
References
K. Raheem, "Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area," Journal of Engineering, vol. 21, no. 02, pp. 37–47, Feb. 2015.
M. R. Mahjoob, M. R. Wali, and H. A. Atyah, "Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP," Journal of Engineering, vol. 22, no. 8, pp. 1–13, Aug. 2016.
M. Laaziri, S. Khoulji, K. Benmoussa, and K. M. Larbi, "Information System for the Governance of University Cooperation," Engineering, Technology & Applied Science Research, vol. 8, no. 5, pp. 3355–3359, Oct. 2018.
S. M. Kori, A. A. Mahessar, M. Channa, A. A. Memon, and A. R. Kori, "Study of Flow Characteristics Over a Rounded Edge Drop Structure in Open Channel," Engineering, Technology & Applied Science Research, vol. 9, no. 3, pp. 4136–4139, Jun. 2019.
F. A. Shaikh, M. S. Shahbaz, and N. Odhano, "A Short Review on Green Supply Chain Management Practices: The Impact on Operational and Environmental Performance," Engineering, Technology & Applied Science Research, vol. 10, no. 2, pp. 5367–5370, Apr. 2020.
S. A. M. Alkaabi and A. M. R. Mahjoob, "Studying the decision-making state and impact in Iraqi construction projects," International Journal of Management and Enterprise Development, vol. 21, no. 3, pp. 279–298, 2022.
S. Khamees and M. R. Altaay, "Optimizing Methods of Funding Residential Complexes Projects," International Journal of Intelligent Systems and Applications in Engineering, vol. 10, no. 3, pp. 57–63, Oct. 2022.
N. N. Abbas and A. M. Burhan, "Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects," Journal of Engineering, vol. 29, no. 01, pp. 128–144, Jan. 2023.
A. M. Burhan, "Developing an expert system for the investigation of construction failure causes by using es builder program," Applied Research Journal, vol. 2, pp. 43–49, 2016.
A. A. Alfahad and A. M. Burhan, "Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector," Journal of Engineering, vol. 30, no. 02, pp. 154–178, Feb. 2024.
S. I. Razzouqi and A. M. R. Mahjob, "Application of Decision Support System in Construction Projects use in Cost Management," Journal of Engineering, vol. 12, no. 01, pp. 85–97, Mar. 2006.
S. R. Mohammed and A. J. Jasim, "Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects," Journal of Engineering, vol. 24, no. 7, pp. 114–133, Jun. 2018.
S. Mahomad, "Study and Analysis of the Delay Problems in Iraqi Construction Projects," International Journal of Science and Research (IJSR), vol. 6, pp. 2331–2336, Jan. 2017.
Al Saffar, K. Raheem, and A. A. Ghaleb, "Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)," Journal of Engineering, vol. 20, no. 10, pp. 79–92, Jul. 2023.
P. S. Majeed and M. R. Altaie, "Investigate IPD Factors’ Effect on Value Engineering for the Communication Sector in Iraq," Journal of Engineering, vol. 30, no. 01, pp. 90–105, Jan. 2024.
Downloads
How to Cite
License
Copyright (c) 2024 Saja Abd Alrazaq Khamees, Sawsan Rasheed Mohammed
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.