Developing a Program for Practice Management and Productivity Improvement of Infrastructure Projects by using Business Information Modeling

Authors

  • Saja Abd Alrazaq Khamees Civil Engineering Department, Baghdad University, Iraq
  • Sawsan Rasheed Mohammed Faculty of Civil Engineering, Engineering College, Baghdad University, Iraq
Volume: 14 | Issue: 4 | Pages: 14970-14976 | August 2024 | https://doi.org/10.48084/etasr.7613

Abstract

The employment of Business Information Modeling (BIM) may assist the resident engineering department in reaching its long-term strategic goals. The suggested computer software was created and tested using the first package of new projects for roads, bridges, and tunnels aimed at solving the traffic congestion crisis taking place in the capital city of Iraq, Baghdad. In the context of the current study, questionnaires and personal interviews with specialists in the field of road, tunnel, and overpass construction were employed. The aim of implementing BIM is to assess the introduced program’s efficiency, verify its performance, and identify any errors, defects, or challenges that users may encounter during its application. The computer program underwent successful testing at several Resident Engineer's Offices (REOs) within the initial package of new projects aimed at addressing traffic congestion issues in Baghdad through independent verification checks. Initially, the program was utilized with the assistance of a user guide to facilitate its operation and provide a detailed description of each program feature which can provide effective decision-making and enhance REOs' computer skills.

Keywords:

Business Information Modeling (BIM), Resident Engineer's Offices (REOs), productivity improvement, decision-making

Downloads

Download data is not yet available.

References

K. Raheem, "Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area," Journal of Engineering, vol. 21, no. 02, pp. 37–47, Feb. 2015.

M. R. Mahjoob, M. R. Wali, and H. A. Atyah, "Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP," Journal of Engineering, vol. 22, no. 8, pp. 1–13, Aug. 2016.

M. Laaziri, S. Khoulji, K. Benmoussa, and K. M. Larbi, "Information System for the Governance of University Cooperation," Engineering, Technology & Applied Science Research, vol. 8, no. 5, pp. 3355–3359, Oct. 2018.

S. M. Kori, A. A. Mahessar, M. Channa, A. A. Memon, and A. R. Kori, "Study of Flow Characteristics Over a Rounded Edge Drop Structure in Open Channel," Engineering, Technology & Applied Science Research, vol. 9, no. 3, pp. 4136–4139, Jun. 2019.

F. A. Shaikh, M. S. Shahbaz, and N. Odhano, "A Short Review on Green Supply Chain Management Practices: The Impact on Operational and Environmental Performance," Engineering, Technology & Applied Science Research, vol. 10, no. 2, pp. 5367–5370, Apr. 2020.

S. A. M. Alkaabi and A. M. R. Mahjoob, "Studying the decision-making state and impact in Iraqi construction projects," International Journal of Management and Enterprise Development, vol. 21, no. 3, pp. 279–298, 2022.

S. Khamees and M. R. Altaay, "Optimizing Methods of Funding Residential Complexes Projects," International Journal of Intelligent Systems and Applications in Engineering, vol. 10, no. 3, pp. 57–63, Oct. 2022.

N. N. Abbas and A. M. Burhan, "Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects," Journal of Engineering, vol. 29, no. 01, pp. 128–144, Jan. 2023.

A. M. Burhan, "Developing an expert system for the investigation of construction failure causes by using es builder program," Applied Research Journal, vol. 2, pp. 43–49, 2016.

A. A. Alfahad and A. M. Burhan, "Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector," Journal of Engineering, vol. 30, no. 02, pp. 154–178, Feb. 2024.

S. I. Razzouqi and A. M. R. Mahjob, "Application of Decision Support System in Construction Projects use in Cost Management," Journal of Engineering, vol. 12, no. 01, pp. 85–97, Mar. 2006.

S. R. Mohammed and A. J. Jasim, "Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects," Journal of Engineering, vol. 24, no. 7, pp. 114–133, Jun. 2018.

S. Mahomad, "Study and Analysis of the Delay Problems in Iraqi Construction Projects," International Journal of Science and Research (IJSR), vol. 6, pp. 2331–2336, Jan. 2017.

Al Saffar, K. Raheem, and A. A. Ghaleb, "Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)," Journal of Engineering, vol. 20, no. 10, pp. 79–92, Jul. 2023.

P. S. Majeed and M. R. Altaie, "Investigate IPD Factors’ Effect on Value Engineering for the Communication Sector in Iraq," Journal of Engineering, vol. 30, no. 01, pp. 90–105, Jan. 2024.

Downloads

How to Cite

[1]
Khamees, S.A.A. and Mohammed, S.R. 2024. Developing a Program for Practice Management and Productivity Improvement of Infrastructure Projects by using Business Information Modeling. Engineering, Technology & Applied Science Research. 14, 4 (Aug. 2024), 14970–14976. DOI:https://doi.org/10.48084/etasr.7613.

Metrics

Abstract Views: 191
PDF Downloads: 307

Metrics Information