Abstract
Construction projects are of great importance because of their large financial allocations in the federal budgets of countries. This study used risk management and value management as an integrative model with Building Information Modeling (BIM). Risk management techniques were used to identify risks and quantify their impact on cost, and value management was used to identify effective mitigation measures for each risk factor. This study developed software to support BIM and risk management, including measures to assess risks and their impact on the cost estimation process, to be part of the information flowing to the project parties. The total number of risks was 52 with multiple mitigation measures for each determined using brainstorming. The Fuzzy Analytical Hierarchal Process (FAHP) was used to determine the relative importance of risk and the cost range of the selected items.
Keywords:
Building Information Modeling (BIM), risk management, value management, integrating modelDownloads
References
Y. Zou, A. Kiviniemi, and S. W. Jones, "A review of risk management through BIM and BIM-related technologies," Safety Science, vol. 97, pp. 88–98, Aug. 2017.
M. D. Nguyen, P. Q. Tran, and H. B. Nguyen, "An Application of Analytic Network Process (ANP) to Assess Critical Risks of Bridge Projects in the Mekong Delta Region," Engineering, Technology & Applied Science Research, vol. 13, no. 3, pp. 10622–10629, Jun. 2023.
K. Abuhasel, "Sustainable Green City Development Project Analysis using the Critical Path Method (CPM) and the Crashing Project Method on Time and Cost Optimization," Engineering, Technology & Applied Science Research, vol. 13, no. 3, pp. 10973–10977, Jun. 2023.
L. Zhang, M. J. Skibniewski, X. Wu, Y. Chen, and Q. Deng, "A probabilistic approach for safety risk analysis in metro construction," Safety Science, vol. 63, pp. 8–17, Mar. 2014.
A. Tomek and P. Matějka, "The Impact of BIM on Risk Management as an Argument for its Implementation in a Construction Company," Procedia Engineering, vol. 85, pp. 501–509, Jan. 2014.
M. M. Dishar and M. R. Altaie, "Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects," Journal of Engineering, vol. 28, no. 7, pp. 31–42, Jul. 2022.
A. S. Filippetto, R. Lima, and J. L. V. Barbosa, "A risk prediction model for software project management based on similarity analysis of context histories," Information and Software Technology, vol. 131, Mar. 2021, Art. no. 106497.
S. F. R. AL-Aga and A. M. Burhan, "Risk Assessment in BOT Contracts using AHP Technique," Journal of Engineering, vol. 29, no. 1, pp. 61–75, Jan. 2023.
P. Brous, M. Janssen, and P. Herder, "The dual effects of the Internet of Things (IoT): A systematic review of the benefits and risks of IoT adoption by organizations," International Journal of Information Management, vol. 51, Apr. 2020, Art. no. 101952.
A. A. Saffar, K. Raheem, and A. A. Ghaleb, "Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)," Journal of Engineering, vol. 20, no. 10, pp. 79–82, 2014.
Y. Zou, A. Kiviniemi, S. W. Jones, and J. Walsh, "Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIM," KSCE Journal of Civil Engineering, vol. 23, no. 2, pp. 467–480, Feb. 2019.
O. H. Abdullah and W. A. Hatem, "Alternative Construction using BIM in Old Educational Buildings," Engineering, Technology & Applied Science Research, vol. 13, no. 2, pp. 10316–10321, Apr. 2023.
S. H. Han and J. E. Diekmann, "Making a risk-based bid decision for overseas construction projects," Construction Management and Economics, vol. 19, no. 8, pp. 765–776, Dec. 2001.
N. Van Thuyet, S. O. Ogunlana, and P. K. Dey, "Risk management in oil and gas construction projects in Vietnam," International Journal of Energy Sector Management, vol. 1, no. 2, pp. 175–194, Jan. 2007.
E. Kissi, E. B. Boateng, T. Adjei-Kumi, and E. Badu, "Principal component analysis of challenges facing the implementation of value engineering in public projects in developing countries," International Journal of Construction Management, vol. 17, no. 2, pp. 142–150, Apr. 2017.
A. A. Alfahad and A. M. Burhan, "A Hybrid Method for Identifying Risks Affecting Performance in Construction Sector in Iraq," in International Research Conference on Engineering and Applied Sciences 2023 (IRCEAS2023), Baghdad, Iraq, Oct. 2023.
S. Byström and A. Pierre, "Risk Management in the bidding context A Schedule Risk Analysis Approach," MSc Thesis, Linkoping University, 2003.
J. E. Diekmann and W. D. Featherman, "Assessing Cost Uncertainty: Lessons from Environmental Restoration Projects," Journal of Construction Engineering and Management, vol. 124, no. 6, pp. 445–451, Nov. 1998.
"Miro | The Visual Workspace for Innovation." https://miro.com/.
S. F. R. AL-Aga and A. M. Burhan, "Risk Assessment in BOT Contracts using AHP Technique," Journal of Engineering, vol. 29, no. 1, pp. 61–75, Jan. 2023.
R. W. Saaty, "The analytic hierarchy process—what it is and how it is used," Mathematical Modelling, vol. 9, no. 3, pp. 161–176, Jan. 1987.
Downloads
How to Cite
License
Copyright (c) 2023 Ali AbdulJabbar Alfahad, Abbas M. Burhan
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.