Categories and Factors of Cost Overrun in Construction Projects: A Systematic Review
Received: 15 September 2024 | Revised: 9 October 2024 | Accepted: 16 October 2024 | Online: 25 October 2024
Corresponding author: Omar Afana
Abstract
Cost overruns represent a significant challenge in construction project management and often compromise project success. This study addresses gaps in previous research, particularly the lack of a unified classification of cost overrun factors. The aim is to provide a comprehensive, unbiased, and structured synthesis of existing research on the factors contributing to cost overruns in construction projects. It involves identifying, evaluating, and categorizing studies to answer predefined research questions related to cost overruns across various geographical contexts, project types, stakeholder perspectives, and project lifecycle phases. Through a Systematic Literature Review (SLR), the current study identifies and categorizes 99 factors into 10 distinct categories: 1) Execution, Resource, and Project Management Factors, 2) Design Factors, 3) Contractor Factors, 4) Consultant Factors, 5) Client Factors, 6) Financial Management Factors, 7) Bidding and Cost Estimation Factors 8) Contracts, Legal, and Regulatory Factors, 9) External Risks, Technology, and Sustainability Factors, and 10) Defects Liability Period (DLP) Operations and Maintenance Factors. Additionally, the present research examines both advanced and traditional methodologies for mitigating these overruns, emphasizing accurate cost estimation, risk management, and the use of advanced technologies, like Building Information Modeling (BIM), alongside strong financial and contract management. This paper synthesizes results from different global contexts to establish a solid foundation for future academic research and industry practices aimed at alleviating cost overruns in construction projects. It also promotes the development of customized frameworks that are specific to a country, a lifecycle phase, or a combination of conditions.
Keywords:
cost overruns, construction management, stakeholder collaboration, project lifecycle, systematic literature reviewDownloads
References
R. Newton, Project Management: Step by Step: How To Plan And Manage A Highly Successful Project, 2nd edition. London, UK: Pearson, 2016.
A. Walker, Project Management in Construction, 6th edition. Hoboken, NJ, USA: John Wiley & Sons, 2015.
P. Fewings and C. Henjewele, Construction Project Management: An Integrated Approach, 3rd edition. London, UK: Routledge, 2019.
B. Andersen, K. Samset, and M. Welde, "Low estimates – high stakes: underestimation of costs at the front-end of projects," International Journal of Managing Projects in Business, vol. 9, no. 1, pp. 171–193, Jan. 2016.
M. Cavalieri, R. Cristaudo, and C. Guccio, "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, vol. 79, pp. 21–36, Jul. 2019.
M. Ali, "Mitigating Cost Overruns: Effective Strategies in Construction," 2023, [Online]. Available: https://www.researchgate.net/publication/373042540_Mitigating_Cost_Overruns_Effective_Strategies_in_Construction.
A. Morad, "An Analysis of Global Construction Projects Causes and Implications of Cost Overruns." OSF, Jun. 14, 2023.
A. Rauzana, "Factors Causing Cost Overruns In Construction Projects," International Journal of Engineering Technologies and Management Research, vol. 9, no. 10, pp. 1–9, Oct. 2022.
N. Al-Hazim, Z. A. Salem, and H. Ahmad, "Delay and Cost Overrun in Infrastructure Projects in Jordan," Procedia Engineering, vol. 182, pp. 18–24, Jan. 2017.
M. AlKhatib and S. Altarazi, "A customized root cause analysis approach for cost overruns and schedule slippagein paper-machine-building projects," Management and Production Engineering Review, vol. 10, no. 2, pp. 83–92, 2019.
T. Subramani, P. S. Sruthi, and M. Kavitha, "Causes of Cost Overrun In Construction," IOSR Journal of Engineering, vol. 4, no. 6, pp. 1–7, Jun. 2014.
S. Tarawneh, M. K. Sarireh, and E. Tarawneh, "Time and Cost Overruns in Jordanian Building Construction Projects," Natural and Applied Sciences Series, vol. 35, no. 1, pp. 53–73, Apr. 2020.
M. Ramabhadran, "An Investigation into Cost Overrun in Construction Projects in United Arab Emirates," International Journal of Construction Engineering and Management, vol. 7, no. 1, pp. 1–21, 2018.
E. A. Namous and M. Al Battah, "Evaluating the Factors That Cause Cost and Time Overrun in the Residential Construction Projects in the UAE: Project Manager Perspective," in 8th Zero Energy Mass Custom Home International Conference, Dubai, United Arab Emirates, Oct. 2021, pp. 370–382.
M. Tayyab, M. Furkhan, M. Rizwan, M. Jameel, and A. Chadee, "A Study on Factors Influencing Cost Overrun in High-rise Building Construction across India," Journal of Smart Buildings and Construction Technology, vol. 5, no. 1, pp. 52–83, May 2023.
R. K. Muhammad, I. A. Rahman, and S. Nagapan, "Overrun Factors during the Construction Phase of Project," International Journal of Sustainable Construction Engineering and Technology, vol. 12, no. 3, pp. 96–102, Oct. 2021.
A. T. Mahmud, S. O. Ogunlana, and W. T. Hong, "Key driving factors of cost overrun in highway infrastructure projects in Nigeria: a context-based perspective," Journal of Engineering, Design and Technology, vol. 19, no. 6, pp. 1530–1555, Jan. 2021.
W. Mengist, T. Soromessa, and G. Legese, "Method for conducting systematic literature review and meta-analysis for environmental science research," MethodsX, vol. 7, Jan. 2020, Art. no. 100777.
A. C. Tricco et al., "PRISMA Extension for Scoping Reviews (PRISMA-ScR): Checklist and Explanation," Annals of Internal Medicine, vol. 169, no. 7, pp. 467–473, Oct. 2018.
A. Gomez-Cabrera, L. Gutierrez-Bucheli, and S. Munoz, "Causes of time and cost overruns in construction projects: a scoping review," International Journal of Construction Management, vol. 24, no. 10, pp. 1107–1125, Jul. 2024.
O. A. I. Hussain, R. C. Moehler, S. D. C. Walsh, and D. D. Ahiaga-Dagbui, "Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Systematic Literature Review," Infrastructures, vol. 8, no. 5, May 2023, Art. no. 93.
A. Al Saeedi and Dr. A. Karim, "Major Factors Of Cost Overrun In Construction Projects: Critical Review," Webology, vol. 19, no. 2, pp. 5921–5930, Jan. 2022.
S. Durdyev, "Review of construction journals on causes of project cost overruns," Engineering, Construction and Architectural Management, vol. 28, no. 4, pp. 1241–1260, Jan. 2021.
M. Enrica, H. H. Purba, and A. Purba, "Risks Leading to Cost Overrun in Construction Projects: A Systematic Literature Review," Advance Researches in Civil Engineering, vol. 3, no. 1, pp. 43–60, Mar. 2021.
M. Z. B. Ismail, Z. B. M. Ramly, and R. B. A. Hamid, "Systematic Review of Cost Overrun Research in the Developed and Developing Countries," International Journal of Sustainable Construction Engineering and Technology, vol. 12, no. 1, pp. 196–211, May 2021.
A. M. F. Albtoush and S. I. Doh, "A Review on Causes of Cost Overrun in the Construction Projects," International Journal of New Innovations in Engineering and Technology, vol. 12, no. 3, pp. 15–22, 2019.
S. Ahady, S. Gupta, and R. K. Malik, "A critical review of the causes of cost overrun in construction industries in developing countries," International Research Journal of Engineering and Technology, vol. 4, no. 3, pp. 2550–2558, 2017.
A. Aljohani, D. Ahiaga-Dagbui, and D. Moore, "Construction Projects Cost Overrun: What Does the Literature Tell Us?," International Journal of Innovation, Management and Technology, vol. 8, no. 2, pp. 137–143, 2017.
S. Vaardini, Karthiyayini, and Ezhilmathi, "Study on cost overruns in construction projects: A review," International Journal of Applied Engineering Research, vol. 11, no. 3, pp. 356–363, Jan. 2016.
S. M. Renuka, C. Umarani, and S. Kamal, "A review on critical risk factors in the life cycle of construction projects," Journal of Civil Engineering Research, vol. 4, no. 2A, pp. 31–36, 2014.
R. Chidambaram, S. P. Narayanan, and A. B. Idrus, "Construction delays causing risks on time and cost - A critical review," The Australasian Journal of Construction Economics and Building, vol. 12, no. 1, pp. 37–57, Aug. 2020.
H. A. M. Abusafiya and S. M. A. Suliman, "Causes and Effects of Cost Overrun on Construction Project in Bahrain: Part I (Ranking of Cost Overrun Factors and Risk Mapping)," Modern Applied Science, vol. 11, no. 7, pp. 20–27, May 2017.
I. A. Rahman, I. B. Ismail, and M. M. Jaber, "Risk Assessment of Time and Cost Overrun Factors throughout Construction Project Lifecycle: Pilot Study," International Journal of Engineering and Technology, vol. 7, pp. 717–723, Oct. 2018.
R. O. Asiedu and E. Adaku, "Cost overruns of public sector construction projects: a developing country perspective," International Journal of Managing Projects in Business, vol. 13, no. 1, pp. 66–84, Jan. 2020.
M. Gebrel, K. A. Assaf, A. Atef, and M. Awad, "Causes of Delay and Cost Overrun for Educational Building Projects in Egypt," Journal of Engineering Sciences, vol. 49, no. 5, pp. 577–596, Sep. 2021.
S. Sohu, A. Jhatial, Q. Jamali, A. H. Buller, and I. Ali, "Critical Cost Overrun Factors and its Controlling Measures in Construction Sector of Pakistan," QUEST Research Journal, vol. 19, no. 1, pp. 70–76, Jun. 2021.
M. H. Kotb, A. S. Aly, and K. M. A. Muhammad, "Risk Assessment of Time and Cost Overrun Factors throughout Construction Project Lifecycle," Life Science Journal, vol. 16, no. 9, pp. 78–91, 2019.
F. H. Shah, O. S. Bhatti, and S. Ahmed, "A Review of the Effects of Project Management Practices on Cost Overrun in Construction Projects," Engineering Proceedings, vol. 44, no. 1, 2023, Art. no. 1.
D. J. Hughes, A. Lee, A. W. Tian, A. Newman, and A. Legood, "Leadership, creativity, and innovation: A critical review and practical recommendations," The Leadership Quarterly, vol. 29, no. 5, pp. 549–569, Oct. 2018.
R. Canesi and B. Gallo, "Risk Assessment in Sustainable Infrastructure Development Projects: A Tool for Mitigating Cost Overruns," Land, vol. 13, no. 1, Jan. 2024, Art. no. 41.
S. Alshihri, K. Al-Gahtani, and A. Almohsen, "Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia," Buildings, vol. 12, no. 7, Jul. 2022, Art. no. 902.
D. B. Grant, C. Y. Wong, and A. Trautrims, Sustainable Logistics and Supply Chain Management: Principles and Practices for Sustainable Operations and Management. London, UK: Kogan Page, 2017.
H. N. Al Siyabi and O. Khaleel, "Cost overrun in construction projects in Oman: Case study," Journal of Student Research, vol. 10, no. 3, pp. 1–26, Aug. 2021.
S. Ahmed, J. Majava, and K. Aaltonen, "Implementation of circular economy in construction projects: a procurement strategy approach," Construction Innovation, vol. 24, no. 7, pp. 204–222, Jan. 2024.
L. Holm, Cost Accounting and Financial Management for Construction Project Managers. London, UK: Routledge, 2018.
D. Ivanov, A. Tsipoulanidis, and J. Schonberger, Global Supply Chain and Operations Management: A Decision-Oriented Introduction to the Creation of Value, 2nd edition. New York, NY, USA: Springer, 2019.
M. A. Q. Obeidat and S. H. Aldulaimi, "The Role of Project Management Information Systems Towards the Project Performance The Case of Construction Projects in United Arab Emirates," International Review of Management and Marketing, vol. 6, no. 3, pp. 559–568, May 2016.
M. Gerges, O. Ahiakwo, M. Jaeger, and A. Asaad, "Building Information Modeling and Its Application in the State of Kuwait," International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering, vol. 10, no. 1, pp. 81–86, 2016.
T. N. Kimani, H. Jallow, M. Njuguna, and A. Alkizim, "BIM Awareness: The Kenyan and UK Scenarios," in Collaboration and Integration in Construction, Engineering, Management and Technology, S. M. Ahmed, P. Hampton, S. Azhar, and A. D. Saul, Eds. New York, NY, USA: Springer, 2021, pp. 117–122.
B. Marr, R. Mutuku, H. Danso, and A. Toure, "Assessment of the Factors Contributing to Cost and Time Overrun in Building Construction Project: A Case Study of Mauritania," International Journal of Innovative Science and Research Technology, vol. 8, no. 11, pp. 978–993, Nov. 2023.
Y.-C. Lin and Y.-T. Hsu, "Enhancing the Visualization of Problems Tracking and Management Integrated BIM Technology for General Contractor in Construction," in Collaboration and Integration in Construction, Engineering, Management and Technology, S. M. Ahmed, P. Hampton, S. Azhar, and A. D. Saul, Eds. New York, NY, USA: Springer, 2021, pp. 427–432.
A. M. Faten Albtoush, S. I. Doh, A. K. A. Mohammed Al-Btoush, and R. A. Rahman, "Techniques to Reduce Cost Overruns During the Design Phase of Construction Projects," Journal of Engineering Science and Technology, vol. 17, no. 1, pp. 0583–0603, Feb. 2022.
R. Sacks, C. Eastman, G. Lee, and P. Teicholz, BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd edition. Hoboken, NJ, New Jersey: John Wiley & Sons, 2018.
T. C. Keng, N. Mansor, and Y. K. Ching, "An Exploration of Cost Overrun in Building Construction Projects," Global Business and Management Research: An International Journal, vol. 10, no. 3, 2018, Art. no. 638.
D. A. Obodoh and C. Obodoh, "Causes and Effects of Construction Project Delays in Nigerian Construction Industry," International Journal of Innovative Science, Engineering & Technology, vol. 3, no. 5, pp. 65–84, 2016.
M. Ikuabe, A. E. Oke, and C. Aigbavboa, "Impact of contractors’ opportunism on construction project transaction costs," Journal of Financial Management of Property and Construction, vol. 25, no. 1, pp. 125–141, Jan. 2020.
A. Alshubbak, E. Pellicer, and J. Catalá, "A collaborative approach to project life cycle definition based on the Spanish construction industry," in 3rd Conference on Engineering Work in Palestine, Nov. 2009, pp. 1–19.
A. Enshassi, S. Mohamed, and S. Abushaban, "Factors affecting the performance of construction projects in the Gaza strip," Journal of Civil Engineering and Management, vol. 15, no. 3, pp. 269–280, Jan. 2009.
P. E. D. Love, D. D. Ahiaga-Dagbui, and Z. Irani, "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, vol. 92, pp. 184–194, Oct. 2016.
I. Mahamid and N. Dmaidi, "Risks Leading to Cost Overrun in Building Construction from Consultants’ Perspective," Organization, Technology & Management in Construction : An International Journal, vol. 5, no. 2, pp. 860–873, Dec. 2013.
M. Sambasivan and Y. W. Soon, "Causes and effects of delays in Malaysian construction industry," International Journal of Project Management, vol. 25, no. 5, pp. 517–526, Jul. 2007.
G. M. Winch, Managing Construction Projects, 2nd Edition: An Information Processing Approach. Wiley-Blackwell, 2009.
M. A. Aldhaheri, "Client Causes of Variation in Construction Projects in United Arab Emirates," Ph.D. dissertation, British University in Dubai, Dubai, United Arab Emirates, 2017.
G. M. Winch, Managing Construction Projects: An Information Processing Approach. Hoboken, NJ, USA: John Wiley & Sons, 2010.
A. M. Hassan, S. M. Renuka, and C. Umarani, "Identification Of Factors Causing Delays And Cost Overruns On Construction Projects In India And EastafricaA," Advanced Engineering Science, vol. 54, no. 6, pp. 3439–3450, Aug. 2022.
H. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling. New York, NY, USA: John Wiley & Sons, 2017.
O. Alhyari, "Owners’ Obligations Under FIDIC Construction Contracts," in Collaboration and Integration in Construction, Engineering, Management and Technology, S. M. Ahmed, P. Hampton, S. Azhar, and A. D. Saul, Eds. New York, NY, USA: Springer, 2021, pp. 197–202.
Y. Zou, A. Kiviniemi, and S. W. Jones, "A review of risk management through BIM and BIM-related technologies," Safety Science, vol. 97, pp. 88–98, Aug. 2017.
O. Torp, A. M. Belay, C. Thodesen, and O. J. Klakegg, "Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects," Procedia Engineering, vol. 145, pp. 1177–1184, Jan. 2016.
"Survey | Future-Ready Index | Global Construction Survey 2019 - KPMG Slovakia," KPMG, May 13, 2024. https://kpmg.com/sk/en/home/
insights/2019/05/global-construction-survey-2019.html.
R. F. Fellows and A. M. M. Liu, Research Methods for Construction. New York, NY, USA: John Wiley & Sons, 2015.
M. A. Wibowo, I. N. Y. Astana, and Rusdi H.A., "An Analysis of Bidding Strategy, Project Performance and Company Performance Relationship in Construction," Procedia Engineering, vol. 125, pp. 95–102, Jan. 2015.
E. Elbeltagi, O. Hosny, M. Dawood, and A. Elhakeem, "BIM-Based Cost Estimation/ Monitoring For Building Construction," International Journal of Engineering Research and Applications, vol. 4, no. 7, pp. 56–66, Aug. 2014.
M. Abdel-Monem, K. T. Alshaer, and K. El-Dash, "Assessing Risk Factors Affecting the Accuracy of Conceptual Cost Estimation in the Middle East," Buildings, vol. 12, no. 7, Jul. 2022, Art. no. 950.
D. D. Ahiaga-Dagbui and S. D. Smith, "Rethinking construction cost overruns: cognition, learning and estimation," Journal of Financial Management of Property and Construction, vol. 19, no. 1, pp. 38–54, Jan. 2014.
A. Bhargava, P. C. Anastasopoulos, S. Labi, K. C. Sinha, and F. L. Mannering, "Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts," Journal of Construction Engineering and Management, vol. 136, no. 11, pp. 1207–1218, Nov. 2010.
M. S. R. Shadid, "Construction Claims Management in United Arab Emirates Construction Industry," M.S. thesis, Eastern Mediterranean University, Famagusta, Cyprus, 2015.
R. H. Clough, G. A. Sears, S. K. Sears, R. O. Segner, and J. L. Rounds, Construction Contracting: A Practical Guide to Company Management, 8th edition. New York, NY, USA: John Wiley & Sons, 2015.
S. S. Asadi and V. E. Rao, "An integrated approach to a critical analysis of risk management in construction projects," International Journal of Civil Engineering and Technology, vol. 9, pp. 20–28, Mar. 2018.
J. Sweet and M. M. Schneier, Legal Aspects of Architecture, Engineering & the Construction Process, 8th edition. Boston, MA, USA: Cengage, 2009.
N. Govindan, kanchan D. Bahukhandi, and T. Sm, "Non-Pecuniary Factors Affecting The Success Of Construction Projects In United Arab Emirates," International Journal of Scientific & Technology Research, vol. 9, pp. 1074–1084, Jun. 2020.
Y. A. Olawale and M. Sun, "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice," Construction Management and Economics, vol. 28, no. 5, pp. 509–526, May 2010.
S. Amini, A. Rezvani, M. Tabassi, and S. S. Malek Sadati, "Causes of cost overruns in building construction projects in Asian countries; Iran as a case study," Engineering, Construction and Architectural Management, vol. 30, no. 7, pp. 2739–2766, Jan. 2023.
D. Badran, R. AlZubaidi, and S. Venkatachalam, "Identification of Key Design Phase-Related Risks in DBB Projects in the UAE—Towards Developing a BIM Solution," Sustainability, vol. 15, no. 8, Jan. 2023, Art. no. 6651.
I. Ahmad and S. El-Sayegh, "Digital Technology and Integration in Construction: The UAE Context," in Collaboration and Integration in Construction, Engineering, Management and Technology, S. M. Ahmed, P. Hampton, S. Azhar, and A. D. Saul, Eds. New York, NY, USA: Springer, 2021, pp. 643–648.
S. B. Abdalla et al., "Comparative Analysis of Building Information Modeling (BIM) Patterns and Trends in the United Arab Emirates (UAE) with Developed Countries," Buildings, vol. 13, no. 3, Mar. 2023, Art. no. 695.
C. J. Kibert, Sustainable Construction: Green Building Design and Delivery. New York, NY, USA: John Wiley & Sons, 2016.
T. M. Froese, "The impact of emerging information technology on project management for construction," Automation in Construction, vol. 19, no. 5, pp. 531–538, Aug. 2010.
T. D. Oesterreich and F. Teuteberg, "Understanding the implications of digitisation and automation in the context of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry," Computers in Industry, vol. 83, pp. 121–139, Dec. 2016.
D. McNair, Defects Liability Period – An Introduction. London, UK: PwC, 2016.
A. Mills, P. E. Love, and P. Williams, "Defect Costs in Residential Construction," Journal of Construction Engineering and Management, vol. 135, no. 1, pp. 12–16, Jan. 2009.
M. I. M. Hasan, N. N. A. Razak, I. R. Endut, S. A. A. Samah, A. R. M. Ridzuan, and S. Saaidin, "Minimizing defects in building construction project," Jurnal Teknologi, vol. 78, no. 5–2, pp. 79–84, May 2016.
I. I. A. Al Hosani, F. T. Dweiri, and U. Ojiako, "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, vol. 11, no. 6, pp. 1250–1259, Dec. 2020.
A. Adam, P.-E. B. Josephson, and G. Lindahl, "Aggregation of factors causing cost overruns and time delays in large public construction projects," Engineering, Construction and Architectural Management, vol. 24, no. 3, pp. 393–406, Jan. 2017.
M. A. Ashtari, R. Ansari, E. Hassannayebi, and J. Jeong, "Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach," Buildings, vol. 12, no. 10, Oct. 2022, Art. no. 1660.
M. M. Ghazal and A. Hammad, "Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects," International Journal of Construction Management, vol. 22, no. 9, pp. 1632–1646, Jul. 2022.
A. Paydar et al., "Cost overrun estimation in the construction of high-rise buildings using fuzzy inference model," Revista de la construccion, vol. 22, no. 2, pp. 382–406, Sep. 2023.
S.-S. Leu, Y. Liu, and P.-L. Wu, "Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis," Buildings, vol. 13, no. 3, Mar. 2023, Art. no. 667.
B. S. Waziri, K. Bala, and S. Bustani, "Artificial Neural Networks in Construction Engineering and Management," International Journal of Architecture, Engineering and Construction, vol. 6, no. 1, pp. 50–60, Mar. 2017.
A. Marzangoushi, A. Mirjalili, and H. D. Dehnavi, "Construction management using ranking effective factors on the construction cost overrun via fuzzy DANP and delphi technique," Revista de Gestao e Secretariado, vol. 14, no. 10, pp. 16416–16428, Oct. 2023.
Z. B. Ahmad, N. Anigbogu, and J. J. Molwus, "Categorisation of Road Construction Projects’ Cost Overruns Causes using Factor Analysis," Arid Zone Journal of Engineering, Technology and Environment, vol. 15, no. 4, pp. 1013–1025, Dec. 2019.
J. Johnson, "Comparing the Effects of ABC and BIM in Construction Projects and Choose the Best Solution to Minimise the Delay and Cost Overrun Using MADMA," PM World Journal, vol. 8, no. 7, pp. 1–18, 2019.
A. Balali, R. C. Moehler, and A. Valipour, "Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: an Iranian case study," International Journal of Construction Management, vol. 22, no. 13, pp. 2577–2585, Oct. 2022.
J. I. Obianyo, O. E. Okey, and G. U. Alaneme, "Assessment of cost overrun factors in construction projects in Nigeria using fuzzy logic," Innovative Infrastructure Solutions, vol. 7, no. 5, Aug. 2022, Art. no. 304.
E. Plebankiewicz and D. Wieczorek, "Adaptation of a Cost Overrun Risk Prediction Model to the Type of Construction Facility," Symmetry, vol. 12, no. 10, Oct. 2020, Art. no. 1739.
S. Sohu, A. H. Abdullah, S. Nagapan, A. Jhatial, K. Ullah, and I. Ali Bhatti, "Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan," Engineering, Technology and Applied Science Research, vol. 8, no. 2, pp. 2770–2774, Apr. 2018.
T. Ramachandra and J. O. B. Rotimi, "Mitigating Payment Problems in the Construction Industry through Analysis of Construction Payment Disputes," Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 7, no. 1, Feb. 2015, Art. no. A4514005.
Downloads
How to Cite
License
Copyright (c) 2024 Omar Afana, Radhi Al Zubaidi, Saleh Abu Dabous, Fakhariya Ibrahim
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.