Analyzing Delay Factors in Iraqi Construction Projects: An ANP Approach with Najaf Governorate as a Case Study

Authors

  • Ali Moosa Alklkali Imam Al-Kadhum College, Baghdad, Iraq
Volume: 14 | Issue: 6 | Pages: 17844-17847 | December 2024 | https://doi.org/10.48084/etasr.8536

Abstract

Construction projects in Iraq often experience delays owing to various factors, making it challenging to accurately estimate completion times. This study investigates the factors contributing to these delays, focusing on the Najaf Governorate as a case study. The primary objective of this study was to investigate issues related to the construction project completion duration, particularly considering Iraq's current unprecedented reconstruction and building efforts. The most significant factors influencing the completion duration were identified through statistical analysis of the samples and application of the Analytic Network Process (ANP) method. Data were collected and refined using a questionnaire designed according to a five-point Likert scale and administered in two rounds. The first round involved 28 participants, whereas the second round included 5 participants. The analysis revealed that contractor inefficiency, particularly from a financial perspective, is one of the most critical factors affecting construction progress and causing delays. The practice of accepting the lowest bids emerged as the second most crucial aspect leading to project delays in Iraq. Additionally, the study concluded that insufficient cash flow for the employer and the lack of technical expertise within the contractor company were the third and fourth most influential factors affecting the duration of construction projects, respectively. This study also highlighted that legal gaps in Iraq's legislative framework for construction projects are among the most significant causes of delays. Finally, the practice of subcontracting was identified as a significant contributor to both delays and poor work quality in the construction projects in Iraq.

Keywords:

ANP, Iraq, construction projects, delay

Downloads

Download data is not yet available.

References

D. S. Santoso and P. G. M. P. Gallage, "Critical factors affecting the performance of large construction projects in developing countries," Journal of Engineering, Design and Technology, vol. 18, no. 3, pp. 531–556, Jan. 2020.

S. H. Khahro and Z. A. Memon, "Non Excusable Delays in Construction Industry: A Causal Study," Engineering, Technology & Applied Science Research, vol. 8, no. 6, pp. 3561–3564, Dec. 2018.

M. A. Hossain, D. Raiymbekov, A. Nadeem, and J. R. Kim, "Delay causes in Kazakhstan’s construction projects and remedial measures," International Journal of Construction Management, vol. 22, no. 5, pp. 801–819, Apr. 2022.

T. Gebrehiwet and H. Luo, "Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study," Procedia Engineering, vol. 196, pp. 366–374, Jan. 2017.

E. Soliman, "Recommendations to Mitigate Delay Causes in Kuwait Construction Projects," American Journal of Civil Engineering and Architecture, vol. 5, no. 6, pp. 253–262, Dec. 2017.

M. A. Khoiry, S. Kalaisilven, and A. Abdullah, "A Review of Minimizing Delay in Construction Industries," presented at the E3S Web of Conferences, International Conference on Civil and Environmental Engineering, Kuala Lumpur, Malaysia, 2018, vol. 65, Art. no. 03004.

S. Durdyev, M. Omarov, and S. Ismail, "Causes of delay in residential construction projects in Cambodia," Cogent Engineering, vol. 4, no. 1, Jan. 2017, Art. no. 1291117.

J. A. Alsuliman, "Causes of delay in Saudi public construction projects," Alexandria Engineering Journal, vol. 58, no. 2, pp. 801–808, Jun. 2019.

Y. Vacanas and C. Danezis, "An overview of the risk of delay in Cyprus construction industry," International Journal of Construction Management, vol. 21, no. 4, pp. 369–381, Apr. 2021.

Downloads

How to Cite

[1]
Alklkali, A.M. 2024. Analyzing Delay Factors in Iraqi Construction Projects: An ANP Approach with Najaf Governorate as a Case Study. Engineering, Technology & Applied Science Research. 14, 6 (Dec. 2024), 17844–17847. DOI:https://doi.org/10.48084/etasr.8536.

Metrics

Abstract Views: 126
PDF Downloads: 164

Metrics Information