Construction and Demolition Waste Management (Tehran Case Study)

Authors

  • B. Rouhi Broujeni Environmental Engineering Department, Science and Research Branch, Islamic Azad University, Tehran, Iran
  • G. A. Omrani Tehran University of Medical Science, Science and Research Branch, Islamic Azad University, Tehran, Iran
  • R. Naghavi Islamic Azad University, Tehran, Iran
  • S. S. Afraseyabi Civil and Environmental Engineering Department, Islamic Azad University, Estahbān, Fars, Iran
Volume: 6 | Issue: 6 | Pages: 1249-1252 | December 2016 | https://doi.org/10.48084/etasr.812

Abstract

Increasing building construction raises concerns about construction and demolition (C&D) waste management. To assess this issue the building components, the collection schemes, their recycling and disposal should be investigated. In order to manage C&D wastes, paying attention to how this kind of wastes is disposed is imperative for their correct identification. Inattention, lack of organization and proper transport and sanitary disposal of construction and demolition waste lead to problems such as accumulation of construction waste in the streets. However, more than 90 percent of the potential for recycling and re-using as raw materials is provided. Environmental Protection Agency (EPA) has classified C&D wastes into three categories: non-dangerous waste, hazardous wastes and semi-hazardous wastes. Currently in Tehran, an average of about 50,000 tons per day of construction and demolition wastes are produced from which over 30,000 tons per day are dumped in landfills. According to this research more than 57% of these wastes are placed in the first category (non-dangerous waste) and have the potential for being recycled and reused. On the other hand, items that are placed in the second category shall be managed based on the existing laws. This article provides some management solutions including proposing methods for collecting and reusing construction waste in accordance with current market needs in Iran.

Keywords:

construction, demolition, waste, recycling, re-use

Downloads

Download data is not yet available.

References

A. Abbas, G. Fathifazl, O. Isgor, A. Razaqpur, B. Fournier, S. Foo “Environmental benefits of green concrete”, IEEE Climate Change Technology Conference, pp. 1–8, 2006 DOI: https://doi.org/10.1109/EICCCC.2006.277204

M. Osmani, “Construction waste minimization in the UK: curent pressure for change and approaches”, Procedia - Social and Behavioral Sciences,Vol. 40, pp. 37-40, 2012 DOI: https://doi.org/10.1016/j.sbspro.2012.03.158

J. D. Goedert, P. Meadati, “Integrating construction process documentation into building information modeling”, Journal of Construction Engineering and Management, Vol. 134, No. 7, pp. 509–516, 2008 DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(509)

M. Osmani, G. Glass, A. Proce, “Architect and contractor attitudes towards waste minimisation, waste and resource management”, Proceedings of the Institution of Civil Engineers - Waste and Resource Management, Vol. 59, No. 2, pp. 65-72, 2006 DOI: https://doi.org/10.1680/warm.2006.159.2.65

P. O. Quantity of Construction and Demolition Waste Collected, https://www.wasterecycling.org

Resource Conservation and Recovery Act of 1976 (RCRA), RCRA Hazardous Waste Resources, Construction, Demolition, And Renovation, www.epa.gov/osw/topics.htm

U. Bogenstatter, “Prediction and optimisation of life-cycle costs in early design”, Building Research and Information, Vol. 28, pp. 376-386, 2000 DOI: https://doi.org/10.1080/096132100418528

O. Faniran, G. Caban, “Minimising waste on construction project sites”, Engineering, Construction and Architectural Management, Vol. 5, No. 2, pp. 182-188,1998 DOI: https://doi.org/10.1046/j.1365-232X.1998.00044.x

HM Government, Strategy for sustainable construction, UK, 2008, http://webarchive.nationalarchives.gov.uk/+/http:/www.bis.gov.uk/files/file46535.pdf

WRAP, 2007a, “Waste recovery quick win case studies” http://www.wrap.org.uk/construction/construction_waste_minimisation_and_management/wrqw_case_studies.html

WRAP, Designing out waste: a design team guide for buildings, 2009

M. L. Tseng, “An assessment of cause and effect decision making model for firm environmental knowledge management capacities in uncertainty”, Environmental Monitoring and Assessment, Vol. 161, pp.549-564, 2010 DOI: https://doi.org/10.1007/s10661-009-0767-2

M. L. Tseng, “Importance-performance analysis on municipal solid waste management in uncertainty”, Environmental Monitoring and Assessment, Vol. 172, No. 1-4, pp.171-187, 2011 DOI: https://doi.org/10.1007/s10661-010-1325-7

J. Holmes, G. Capper, G. Hudson, “21st century health care centres in the United Kingdom”, Journal of Facilities Management, Vol. 4, pp. 99-109, 2006 DOI: https://doi.org/10.1108/14725960610651197

C. S. Poon, “Reducing construction waste”, Waste Management, Vol. 27, pp. 1715-1716, 2007 DOI: https://doi.org/10.1016/j.wasman.2007.08.013

Downloads

How to Cite

[1]
B. Rouhi Broujeni, G. A. Omrani, R. Naghavi, and S. S. Afraseyabi, “Construction and Demolition Waste Management (Tehran Case Study)”, Eng. Technol. Appl. Sci. Res., vol. 6, no. 6, pp. 1249–1252, Dec. 2016.

Metrics

Abstract Views: 1192
PDF Downloads: 697

Metrics Information