Problems and Barriers Affecting Total Productive Maintenance Implementation

Authors

  • M. A. Munir Department of Mechanical, Manufacturing and Mechatronics Engineering, University of Engineering & Technology, Pakistan
  • M. A. Zaheer Department of Mechanical Engineering, The University of Sargodha, Pakistan
  • M. Haider Department of Mechanical Engineering, The University of Lahore, Pakistan
  • M. Z. Rafique Department of Mechanical Engineering, The University of Lahore, Pakistan
  • M. A. Rasool Department of Mechanical Engineering, The University of Lahore, Pakistan
  • M. S. Amjad Department of Mechanical Engineering, The University of Lahore, Pakistan
Volume: 9 | Issue: 5 | Pages: 4818-4823 | October 2019 | https://doi.org/10.48084/etasr.3082

Abstract

Total productive maintenance (TPM) is at the forefront of the maintenance strategies which brought about a paradigm shift from repair-maintenance strategy to proactive maintenance. The philosophy of TPM entails the facets of cost reduction and increased productivity. However, it has been observed that many manufacturing enterprises have made unsuccessful attempts at its adoption. In order to detect and overcome a qualitative research methodology has been employed and a survey has been carried out identifying the barriers and categorizing them to strategic, managerial, departmental, financial, and social regimes through rigorous data analysis. It was observed that strategic constraints are primarily detrimental to the success of TPM due to the lack of defined strategies for workers by management. Moreover, the departmental constraints are present due to misalignment between TPM and departmental objectives, in addition to the lack of training for workers in the system for TPM implementation. Moreover, there are managerial and financial constraints due to the lack of information visibility and finances, social constraints due to gap between top management authorization and worker mentality. Finally, a proper strategy has been proposed to address the issues affecting TPM implementation.

Keywords:

total productive maintenance, Cronbach’s alpha, correlation analysis, one way ANOVA

Downloads

Download data is not yet available.

References

R. Attri, S. Grover, N. Dev, “A Graph Theoretic Approach to Evaluate the Intensity of Barriers in the Implementation of Total Productive Maintenance (TPM)”, International Journal of Production Research, Vol. 52, No. 10, pp. 3032-3051, 2014 DOI: https://doi.org/10.1080/00207543.2013.860250

A. K. Digalwar, P. V. Nayagam, “Implementation of Total Productive Maintenance in Manufacturing Industries: A Literature-Based Metadata Analysis”, IUP Journal of Operations Management, Vol. 13, No. 1, pp. 1-15, 2014

I. S. Ahuja, “Exploring the Impact of Effectiveness of Total Productive Maintenance Strategies in Manufacturing Enterprise”, International Journal of Productivity and Quality Management, Vol. 9, No. 4, pp. 486-501, 2012 DOI: https://doi.org/10.1504/IJPQM.2012.047194

M. Rolfsen, C. Langeland, “Successful Maintenance Practice through Team Autonomy”, Employee Relations, Vol. 34, No. 3, pp. 306-321, 2012 DOI: https://doi.org/10.1108/01425451211217725

G. Sardana, S. Sinha, “Enhancing Firm Competitiveness in Fast Track through Total Productive Maintenance”, International Journal of Indian Culture and Business Management, Vol. 4, No. 1, pp. 88-103, 2010 DOI: https://doi.org/10.1504/IJICBM.2011.037427

M. Kaur, K. Singh, I. Singh Ahuja, “An Evaluation of the Synergic Implementation of Tqm and Tpm Paradigms on Business Performance”, International Journal of Productivity and Performance Management, Vol. 62, No. 1, pp. 66-84, 2012 DOI: https://doi.org/10.1108/17410401311285309

M. C. Eti, S. Ogaji, S. Probert, “Reducing the Cost of Preventive Maintenance (PM) through Adopting a Proactive Reliability-Focused Culture”, Applied Energy, Vol. 83, No. 11, pp. 1235-1248, 2006 DOI: https://doi.org/10.1016/j.apenergy.2006.01.002

G. Singh, I. S. Ahuja, “Strategies and Success Factors for Overcoming Challenges in Jit Implementation in Indian Manufacturing Industry”, International Journal of Technology, Policy and Management, Vol. 13, No. 1, pp. 15-33, 2013 DOI: https://doi.org/10.1504/IJTPM.2013.051006

I. Ahuja, J. Khamba, “An Evaluation of TPM Implementation Initiatives in an Indian Manufacturing Enterprise”, Journal of Quality in Maintenance Engineering, Vol. 13, No. 4, pp. 338-352, 2007 DOI: https://doi.org/10.1108/13552510710829443

A. Parida, U. Kumar, “Maintenance Performance Measurement (MPM): Issues and Challenges”, Journal of Quality in Maintenance Engineering, Vol. 12, No. 3, pp. 239-251, 2006 DOI: https://doi.org/10.1108/13552510610685084

J. Garcia Arca, J. Carlos Prado Prado, “Personnel Participation as a Key Factor for Success in Maintenance Program Implementation: A Case Study”, International Journal of Productivity and Performance Management, Vol. 57, No. 3, pp. 247-258, 2008 DOI: https://doi.org/10.1108/17410400810857257

M. Rodrigues, K. Hatakeyama, “Analysis of the Fall of TPM in Companies”, Journal of Materials Processing Technology, Vol. 179, No. 1-3, pp. 276-279, 2006 DOI: https://doi.org/10.1016/j.jmatprotec.2006.03.102

R. Ahmad, S. Kamaruddin, “An Overview of Time-Based and Condition-Based Maintenance in Industrial Application”, Computers & Industrial Engineering,Vol. 63, No. 1, pp. 135-149, 2012 DOI: https://doi.org/10.1016/j.cie.2012.02.002

Downloads

How to Cite

[1]
Munir, M.A., Zaheer, M.A., Haider, M., Rafique, M.Z., Rasool, M.A. and Amjad, M.S. 2019. Problems and Barriers Affecting Total Productive Maintenance Implementation. Engineering, Technology & Applied Science Research. 9, 5 (Oct. 2019), 4818–4823. DOI:https://doi.org/10.48084/etasr.3082.

Metrics

Abstract Views: 1741
PDF Downloads: 720

Metrics Information