Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan
Abstract
Stakeholders of the construction industry and academia are often facing problems of cost overrun. It has been observed that many constructions of highway projects are not completed at the approved cost due to certain factors. The objective of this research is to identify the cost overrun critical factors involved in highway projects with their significant mitigation measures. In this regard, literature review helped to identify 64 factors of cost overrun. Based on these 64 common factors, a preliminary survey was carried out among 30 selected respondents of highway projects to identify the critical factors of cost overrun and its possible mitigation measures. Results of the preliminary study reported 8 critical factors and 42 possible mitigation measures for the identified factors. Another questionnaire was established on the findings of the preliminary survey and was distributed among 350 stakeholders of highway projects to identify the significant mitigation measures of finding critical factors of cost overrun. In total, 8 significant mitigation measures were identified as causative and critical factors of cost overrun. The findings of this research would be helpful for the construction practitioners who are dealing with cost overrun issues in the highway projects of Pakistan.
Keywords:
mitigation measures, critical factors, cost overrun, highway projects, PakistanDownloads
References
N. Ejaz, I. Ali, M. F. Tahir, “Assessment of delays and cost overruns during construction projects in Pakistan”, available at: http://dl.lib.mrt.ac.lk/handle/123/9431, 2013
I. Avotos, “Cost-relevance analysis for overrun control”, International Journal of Project Management, Vol. 1, No. 3, pp. 142–148, 1983 DOI: https://doi.org/10.1016/0263-7863(83)90018-2
N. Azhar, R. U. Farooqui, S. M. Ahmed, “Cost overrun factors in construction industry of Pakistan”, First International Conference on Construction In Developing Countries, Advancing and Integrating Construction Education, Research & Practice, Karachi,, Pakistan, pp. 499–508, August 4-5, 2008
I. Abdul Rahman, A. H. Memon, A. Azis, A. Asmi, N. H. Abdullah, “Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective”, Research Journal of Applied Sciences, Engineering and Technology, Vol. 5, No. 6, pp. 1963–1972, 2013 DOI: https://doi.org/10.19026/rjaset.5.4736
A. Alhomidan, “Factors affecting cost overrun in road construction projects in Saudi Arabia”, International Journal of Civil & Environmental Engineering, Vol. 13, No. 03, 2013
A. C. Devi, K. Ananthanarayanan, “Factors influencing cost over-run in Indian construction projects,” MATEC Web of Conferences, Vol. 120, p. 02023, 2017 DOI: https://doi.org/10.1051/matecconf/201712002023
S. Shanmugapriya, K. Subramanian, “Investigation of significant factors influencing time and cost overruns in Indian construction projects”, International Journal of Emerging Technology and Advanced Engineering, Vol. 3, No. 10, pp. 734-740, 2013
C. Kaliba, M. Muya, K. Mumba, “Cost escalation and schedule delays in road construction projects in Zambia”, International Journal of Project Management, Vol. 27, No. 5, pp. 522-531, 2009 DOI: https://doi.org/10.1016/j.ijproman.2008.07.003
I. Zafar, T. Yousaf, S. Ahmed, “Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan–a case study”, KSCE Journal of Civil Engineering, Vol. 20, No. 5, pp. 1613-1620, 2016 DOI: https://doi.org/10.1007/s12205-015-0348-6
H. A. M. Abusafiya, S. M. A. Suliman, “Causes and Effects of Cost Overrun on Construction Project in Bahrain: Part I (Ranking of Cost Overrun Factors and Risk Mapping)”, Modern Applied Science, Vol. 11, No. 7, pp. 20-27, 2017 DOI: https://doi.org/10.5539/mas.v11n7p20
S. Ahady, S. Gupta, R. K. Malik ,“A study of the causes of cost overrun in construction industry in Afghanistan”, International Journal of Engineering Development and Research, Vol. 5, No. 3, pp. 978–985, 2017
P. Jadhav, D. Desai, A. Gupta, “Analysis of Construction Cost Overrun Causes-Contractor’s View”, Imperial Journal of Interdisciplinary Research, Vol. 2, No. 8, pp. 908–910, 2016
A. A. Ade, H. M. Aftab, A. Ismail, T. A. Ahmad, “Controlling cost overrun factors in construction projects in Malaysia”, Journal of Applied Science, Engineering and Technology, Vol. 5, No. 8, pp. 2621–2629, 2013 DOI: https://doi.org/10.19026/rjaset.5.4706
J. A. B. Awolesi, J. K. Fabi, O. A. Akinseinde, “Assessment of Contractors’ Mitigating Measures for Cost Overrun of Building Projects in South-Western Nigeria”, Journal of Sustainable Development, Vol. 8, No. 9, pp. 139-146, 2015 DOI: https://doi.org/10.5539/jsd.v8n9p139
L. Xin, W. Rong, “Survey research on relationship among service failure, service recovery and customer satisfaction”, International Conference on Management Science and Engineering, Harbin, China, pp. 1121-1126, August 20-22, 2007 DOI: https://doi.org/10.1109/ICMSE.2007.4421996
S. Sohu, A. H. Abdullah, S. Nagapan, A. Fattah, K. Ullah, K. Kumar, “Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan”, AIP Conference Proceedings, Vol. 1892, No. 1, p. 080002, 2017 DOI: https://doi.org/10.1063/1.5005728
A. Senouci, A. A. Ismail, N. Eldin, “Time and Cost Overrun in Public Construction Projects in Qatar Procedia Engineering, Vol. 164, pp. 368–375, 2016 DOI: https://doi.org/10.1016/j.proeng.2016.11.632
I. Ismail, “Risk assessment of time and cost overrun factors throughout construction project lifecycle”, PhD Thesis, Universiti Tun Hussein Onn Malaysia, 2014
Z. Shehu, I. R. Endut, A. Akintoye, “Factors contributing to project time and hence cost overrun in the Malaysian construction industry”, Journal of Financial Management of Property and Construction, Vol. 19, No. 1, pp. 55–75, 2014 DOI: https://doi.org/10.1108/JFMPC-04-2013-0009
A. Ambituuni, “Five causes of Project delay and cost overrun, and their mitigation measures”, MSc Thesis, The Robert Gordon University, 2011
J. K. Larsen, G. Q. Shen, S. M. Lindhard, T. D. Brunoe, “Factors affecting schedule delay, cost overrun, and quality level in public construction projects”, Journal of Management in Engineering, Vol. 32, No. 1, p. 04015032, 2015 DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391
R. O. Asiedu, E. Adaku, D. G. Owusu-Manu, “Beyond the causes–rethinking mitigating measures to avert cost and time overruns in construction projects”, Construction Innovation, Vol. 17, No. 3, pp. 363-380, 2017 DOI: https://doi.org/10.1108/CI-01-2016-0003
A. H. Memon, I. A. Rahman, M. R. Abdullah, A. A. A. Azis, “Factors affecting construction cost performance in project management projects: Case of MARA large projects”, International Journal of Civil Engineering and Built Environment, Vol. 1, No. 1, pp. 30-35, 2014
Downloads
How to Cite
License
Authors who publish with this journal agree to the following terms:
- Authors retain the copyright and grant the journal the right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) after its publication in ETASR with an acknowledgement of its initial publication in this journal.