[1]
E. Ondigo and C. Wekesa, “Economic Viability of Distribution Network Upgrade Deferral through BESS Sizing from K-Means Clustered Annual Load Profile Data”, Eng. Technol. Appl. Sci. Res., vol. 14, no. 3, pp. 14517–14524, Jun. 2024.