[1]
D. D. G. Pangemanan, E. Aprianti, and F. A. Larwuy, “Time and Cost Optimization of the Coordinating Ministry 4 Office Building Construction in Nusantara Using the Time-Cost Trade-Off Method”, Eng. Technol. Appl. Sci. Res., vol. 15, no. 6, pp. 28622–28628, Dec. 2025.