Akhund, M. A., Khoso, A. R., Pathan, A. A., Imad, H. U., & Siddiqui, F. (2018). Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan. Engineering, Technology & Applied Science Research, 8(4), 3260–3264. https://doi.org/10.48084/etasr.2203