(1)
Topan, .; Lopa, R. T.; Bakri, B. The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6. Eng. Technol. Appl. Sci. Res. 2025, 15, 27400-27405.