[1]
Ateekh-Ur-Rehman, . and Usmani, Y.S. 2012. Field Engineers’ Scheduling at Oil Rigs: a Case Study. Engineering, Technology & Applied Science Research. 2, 1 (Feb. 2012), 155–161. DOI:https://doi.org/10.48084/etasr.95.