[1]
Ondigo, E. and Wekesa , C. 2024. Economic Viability of Distribution Network Upgrade Deferral through BESS Sizing from K-Means Clustered Annual Load Profile Data. Engineering, Technology & Applied Science Research. 14, 3 (Jun. 2024), 14517–14524. DOI:https://doi.org/10.48084/etasr.7189.