[1]
Akhund, M.A., Khoso, A.R., Pathan, A.A., Imad, H.U. and Siddiqui, F. 2018. Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan. Engineering, Technology & Applied Science Research. 8, 4 (Aug. 2018), 3260–3264. DOI:https://doi.org/10.48084/etasr.2203.