[1]
Al Ahmad, M.H., Arifuddin, R. and Abdurrahman, M.A. 2026. Cost Overrun Factors in Construction Projects: A BIM and SEM Analysis. Engineering, Technology & Applied Science Research. 16, 2 (Apr. 2026), 33365–33374. DOI:https://doi.org/10.48084/etasr.14744.