[1]
Pangemanan, D.D.G., Aprianti, E. and Larwuy, F.A. 2025. Time and Cost Optimization of the Coordinating Ministry 4 Office Building Construction in Nusantara Using the Time-Cost Trade-Off Method. Engineering, Technology & Applied Science Research. 15, 6 (Dec. 2025), 28622–28628. DOI:https://doi.org/10.48084/etasr.11842.