Implementation of Lean Manufacturing in a Cement Industry

Authors

Abstract

The lean manufacturing concept is a systematic minimization of waste and non-value activities in production processes introduced by the Toyota production system. In this research, lean manufacturing is implemented in a cement production line. Value Stream Mapping (VSM) is applied to give a clear picture of the value chain in cement production processes and to highlight the non-value-added in the shop floor. To begin, the existing VSM is constructed based on the information and data gathered during visiting and observing the manufacturing process in the firm. As a result, the excess inventory between workstations was identified as a major waste generation, hence, the proposed VSM conducts further improvement and makes action plans to alleviate the unwanted activities. Then, the takt time to ensure smooth material flow and to avoid any occurring delay or bottleneck in the production line was figured out. The supermarket pull-based production control is suggested to be adopted in the future map. Two pull production strategies are selected in this case. The first is applying the Kanban system to control the level of inventory between workstations. The other is the CONWIP approach to control the amount of work in process to the entire production line. The outcome of the proposed models indicates a decrease of the none-value time from 23 days in the current state to about 4 and 2 days in Kanban and CONWIP systems respectively, so the CONWIP was suggested as most efficient. Some suggestions for further research are also mentioned.

Keywords:

cement industry, CONWIP, kanban, pull systems, value stream mapping, lean manufacturing

Downloads

Download data is not yet available.

References

G. A. Rankin, "Portland cement," Journal of the Franklin Institute, vol. 181, no. 6, pp. 747–784, Jun. 1916. DOI: https://doi.org/10.1016/S0016-0032(16)90148-0

J. F. Ryan, "The story of Portland cement," Journal of Chemical Education, vol. 6, no. 11, pp. 1854–1868, Nov. 1929. DOI: https://doi.org/10.1021/ed006p1854

P. E. Halstead, "The Early History of Portland Cement," Transactions of the Newcomen Society, vol. 34, no. 1, pp. 37–54, Jan. 1961. DOI: https://doi.org/10.1179/tns.1961.003

V. A. Kaiser, "Computer control in the cement industry," Proceedings of the IEEE, vol. 58, no. 1, pp. 70–77, Jan. 1970. DOI: https://doi.org/10.1109/PROC.1970.7541

D. Le Sar, "The production of sulphate-resisting and marine cements from local raw materials," Ph.D. dissertation, Department of Chemistry, The University of Cape Town, Cape Town, South Africa, 1964.

A. Sicakova, E. Kardosova, and M. Spak, "Perlite Application and Performance Comparison to Conventional Additives in Blended Cement," Engineering, Technology & Applied Science Research, vol. 10, no. 3, pp. 5613–5618, Jun. 2020. DOI: https://doi.org/10.48084/etasr.3487

M. E. Porter, Competitive Advantage: Creating and Sustaining Superior Performance. New York, NY, USA: Free Press, 1998.

M. T. Fernandes, "Value Analysis: Going into a Further Dimension", Engineering, Technology & Applied Science Research, Vol. 5, No. 2, pp. 781-789, 2015. DOI: https://doi.org/10.48084/etasr.535

T. Ohno and N. Bodek, Toyota Production System: Beyond Large-Scale Production, 1st ed. Cambridge, MA, USA: Productivity Press, 1988.

J. P. Womack, D. Jones, D. Roos, The Machine That Changed the World. New York, NY, USA: Rawson Associates, 1990.

M. Rother, J. Shook, J. Womack, and D. Jones, Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA, 1st ed. Cambridge, MA, USA: Lean Enterprise Institute, 1999.

J. K. Liker, The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer, New York , NY, USA: McGraw-Hill, 2004.

T. Tourki, "Implementation of Lean Within the Cement Industry," Ph.D. dissertation, De Montfort University, Leicester, UK, 2010.

S. Deo, "Methodology to implement lean manufacturing in cement industry," M.S. thesis, Lamar University, Beaumont, TX, USA, 2013.

M. Graisa and A. Al‐Habaibeh, "An investigation into current production challenges facing the Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy," Journal of Manufacturing Technology Management, vol. 22, no. 4, pp. 541–558, Jan. 2011. DOI: https://doi.org/10.1108/17410381111126445

A. M. Saifuddoha, M. A. Habib, S. Y. Sumi, S. Jennurine, and M. S. Islam, "Minimization of waste by applying value stream mapping in the supply chain of cement industry," IOSR Journal of Business and Management, vol. 9, no. 3, pp. 79–84, 2013. DOI: https://doi.org/10.9790/487X-0937984

M. I. Qureshi, M. Iftikhar, M. N. Bhatti, T. Shams, and K. Zaman, "Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan," SpringerPlus, vol. 2, no. 1, Dec. 2013, Art. no. 645. DOI: https://doi.org/10.1186/2193-1801-2-645

E. Alghadafi and M. Latif, "Simulation of a Libyan Cement Factory," in Proceedings of the World Congress on Engineering 2010 Vol III, London, UK, Jul. 2010.

B. Noche and T. Elhasia, "Approach to Innovative Supply Chain Strategies in Cement Industry; Analysis and Model Simulation," Procedia - Social and Behavioral Sciences, vol. 75, pp. 359–369, Apr. 2013. DOI: https://doi.org/10.1016/j.sbspro.2013.04.041

E. Amrina and A. A. A. Lubis, "Minimizing Waste Using Lean Manufacturing : A Case in Cement Production," in 4th International Conference on Industrial Engineering and Applications (ICIEA), Nagoya, Japan, Apr. 2017. DOI: https://doi.org/10.1109/IEA.2017.7939181

R. P. Marek, D. A. Elkins, and D. R. Smith, "Understanding the fundamentals of Kanban and CONWIP pull systems using simulation," in Proceeding of the 2001 Winter Simulation Conference, Arlington, VA, USA, Dec. 2001, vol. 2, pp. 921–929.

M. L. Spearman, D. L. Woodruff, and W. J. Hopp, "CONWIP: A pull alternative to kanban," International Journal of Production Research., vol. 28, no. 5, pp. 879–894, 1990. DOI: https://doi.org/10.1080/00207549008942761

M. Bertolini, M. Braglia, G. Romagnoli, and F. Zammori, "Extending value stream mapping: The synchro-MRP case," International Journal of Production Research., vol. 51, no. 18, pp. 5499–5519, 2013. DOI: https://doi.org/10.1080/00207543.2013.784415

M. L. Spearman and M. A. Zazanis, "Push and pull production systems. Issues and comparisons," Operations Research., vol. 40, no. 3, pp. 521–532, 1992. DOI: https://doi.org/10.1287/opre.40.3.521

W. J. Hopp and M. L. Spearman, Factory Physics, 3rd ed. New York, NY, USA: McGraw-Hill, 2008.

L. J. Krajewski and L.P. Ritzman, Operations Management: Strategy and Analysis, 6th ed. New Jersey, NJ, USA: Prentice Hall, 2001.

J. D. C. Little, "A Proof for the Queuing Formula: L = λW," Operations Research, vol. 9, no. 3, pp. 383–387, Jun. 1961. DOI: https://doi.org/10.1287/opre.9.3.383

Downloads

How to Cite

[1]
M. Masmali, “Implementation of Lean Manufacturing in a Cement Industry”, Eng. Technol. Appl. Sci. Res., vol. 11, no. 3, pp. 7069–7074, Jun. 2021.

Metrics

Abstract Views: 4433
PDF Downloads: 3279

Metrics Information