Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan

Authors

  • F. A. Shaikh Department of Economics, University of Sindh, Pakistan
Volume: 10 | Issue: 1 | Pages: 5247-5250 | February 2020 | https://doi.org/10.48084/etasr.3271

Abstract

One important and well-known issue for the majority of construction projects such as buildings, roads, bridges, airports and many more projects all over the world is time and cost overrun. Project pricing and time period delay are also major issues. The current investigation is taking into consideration the mega construction projects in the provinces of Pakistan, looking into various components controlling and dominating time and cost overrun. A total of 29 factors were identified from literature work and one questionnaire was designed and distributed among 160 respondents. All collected data were analyzed by the average index method. Factors having value more than 3.6 were selected as main factors of cost and time overrun, and five factors were revealed to surpass this barrier. Time and cost overrun are of the leading financial mismanagement issues of the economy of Pakistan. This study will be helpful for stakeholders to control both cost and time overrun in the mega construction projects of Pakistan.

Keywords:

cost overrun, time overrun, Pakistan, finance management, factors

Downloads

Download data is not yet available.

References

S. Sohu, A. H. Abdullah, S. Nagapan, T. A. Rind, A. A. Jhatial, “Controlling measures for cost overrun causes in highway projects of Sindh province”, Engineering, Technology & Applied Science Research, Vol. 9, No. 3, pp. 4276-4280, 2019 DOI: https://doi.org/10.48084/etasr.2749

N. A. A. Bari, R. Yusuff, N. Ismail, A. Jaapar, R. Ahmad, “Factors influencing the construction cost of Industrialised Building System (IBS) projects”, Procedia-Social and Behavioral Sciences, Vol. 35, pp. 689-696, 2012 DOI: https://doi.org/10.1016/j.sbspro.2012.02.138

N. H. Abas, N. Blismas, H. Lingard, “Knowledge-based energy damage model for evaluating Industrialised Building Systems (IBS) Occupational Health and Safety (OHS) risk”, MATEC Web of Conferences, Vol. 47, Article ID 04015, 2016 DOI: https://doi.org/10.1051/matecconf/20164704015

S. Sohu, A. H. Abdullah, S. Nagapan, A. Fattah, K. Ullah, K. Kumar, “Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan”, AIP Conference Proceedings, Vol. 1892, Article ID 080002, 2017 DOI: https://doi.org/10.1063/1.5005728

M. A. M. Amin, N. H. Abas, S. Shahidan, M. H. Rahmat, N. A. Suhaini, S. Nagapan, R. A. Rahim, “A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia's construction industry”, IOP Conference Series: Materials Science and Engineering, Vol. 271, Article ID 012031, 2017 DOI: https://doi.org/10.1088/1757-899X/271/1/012031

N. Abas, N. Blismas, H. Lingard, “Development of a knowledge-based energy damage model to assess Occupational Health and Safety (OHS) construction risks in Malaysia”, CIBW099 Prevention: Means to the End of Construction Injuries, Illnesses, and Fatalities, Washington, USA, August 24-26, 2011

Y. A. Olawale, M. Sun, “Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice”, Construction Management and Economics, Vol. 28, No. 5, pp. 509-526, 2010 DOI: https://doi.org/10.1080/01446191003674519

P. F. Kaming, P. O. Olomolaiye, G. D. Holt, F. G. Harris, “Factors influencing construction time and cost overruns on high-rise projects in Indonesia”, Construction Management & Economics, Vol. 15, No. 1, pp. 83-94, 1997 DOI: https://doi.org/10.1080/014461997373132

A. H. Memon, I. A. Rahman, M. R. Abdullah, A. A. A. Azis, “Factors affecting construction cost performance in project management projects: Case of MARA large projects”, International Journal of Civil Engineering and Built Environment, Vol. 1, No. 1, pp. 30- 35, 2014

Z. Shehu, I. R. Endut, A. Akintoye, G. D. Holt, “Cost overrun in the Malaysian construction industry projects: A deeper insight”, International Journal of Project Management, Vol. 32, No. 8, pp. 1471-1480, 2014 DOI: https://doi.org/10.1016/j.ijproman.2014.04.004

S. T. Ng, M. M. Y. Mak, R. M. Skitmore, K. C. Lam, M. Varnam, “The predictive ability of Bromilow's timecost model”, Construction Management and Economics, Vol. 19, No. 2, pp. 165-173, 2001 DOI: https://doi.org/10.1080/01446190150505090

N. Azhar, R. U. Farooqui, S. M. Ahmed, “Cost overrun factors in construction industry of Pakistan”, First International Conference on Construction In Developing Countries, Karachi, Pakistan, August 4-5, 2008

P. Gonzalez, V. Gonzalez, K. Molenaar, F. Orozco, “Analysis of causes of delay and time performance in construction projects”, Journal of Construction Engineering and Management, Vol. 140, No. 1, Article ID 04013027, 2014 DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000721

A. A. Zaini, H. Adnan, R. C. Haron, “Contractors’ approaches to risk management at the construction phase in Malaysia”, International Conference on Construction Project Management, Chengdu, China, November 16-18, 2010

S. M. Ahmed, S. Azhar, P. Kappagantula, D. Gollapudil, “Delays in construction: A brief study of the Florida construction industry”, ASC 39th Annual Conference, Clemson, USA, April 10-12, 2003

S. Alwi, K. D. Hampson, “Identifying the important causes of delays in building construction projects”, 9th East Asia-Pacific Conference on Structural Engineering and Construction, Bali, Indonesia, December 16-18, 2003

F. A. Soomro, M. J. Memon, A. F. Chandio, S. Sohu, R. Soomro, “Causes of time overrun in construction of building projects in Pakistan”, Engineering, Technology & Applied Science Research, Vol. 9, No. 1, pp. 3762-3764, 2019 DOI: https://doi.org/10.48084/etasr.2449

S. Sohu, A. H. B. Abdullah, B. A. Memon, S. Nagapan, N. U. K. Bhatti, “Mitigation measures for significant factors instigating cost overrun in highway projects”, Civil Engineering Journal, Vol. 4, No. 10, pp. 2338-2344, 2018 DOI: https://doi.org/10.28991/cej-03091163

K. Ullah, A. H. Abdullah, S. Nagapan, S. Sohu, M. S. Khan, “Measures to mitigate causative factors of budget overrun in Malaysian building projects”, International Journal of Integrated Engineering, Vol. 10, No. 9, pp. 66-71, 2018

S. Morris, “Cost and time overruns in public sector projects”, Economic and Political Weekly, Vol. 25, No. 47, pp. M154-M168, 1990

Y. Frimpong, J. Oluwoye, L. Crawford, “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study”, International Journal of Project Management, Vol. 21, No. 5, pp. 321-326, 2003 DOI: https://doi.org/10.1016/S0263-7863(02)00055-8

S. Sohu, A. H. Abdullah, S. Nagapan, N. A. Memon, R. Yunus, M. F. Hasmori, “Causative factors of cost overrun in building projects of Pakistan”, International Journal of Integrated Engineering, Vol. 10, No. 9, pp. 23-27, 2018

Downloads

How to Cite

[1]
F. A. Shaikh, “Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan”, Eng. Technol. Appl. Sci. Res., vol. 10, no. 1, pp. 5247–5250, Feb. 2020.

Metrics

Abstract Views: 1190
PDF Downloads: 689

Metrics Information

Most read articles by the same author(s)