Controlling Measures for Cost Overrun Causes in Highway Projects of Sindh Province

Authors

  • S. Sohu Department of Civil Engineering, Quaid-e-Awam University College of Engineering, Science & Technology, Pakistan
  • A. H. Abdullah Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • S. Nagapan Department of Civil Engineering Technology, University Tun Hussein Onn Malaysia, Malaysia
  • T. A. Rind Department of Civil Engineering, Mehran University of Engineering and Technology, Pakistan
  • A. A. Jhatial Department of Civil Engineering, Mehran University of Engineering and Technology, Pakistan

Abstract

Cost overrun is a serious issue in the construction industry worldwide, including Pakistan. Cost overrun is a critical and serious issue found in highway projects among all construction projects in Pakistan. Cost overrun occurs when the final cost of the projects exceeds the actual cost of the project. The main objective of this research is to identify the main causes of cost overrun and to determine possible mitigation measures of the identified main causes of cost overrun from contractors of highway/road projects of Pakistan. In this study, a mixed mode (quantitative and qualitative) approach was used. A deep literature review helped to identify the 30 most common causes of cost overrun in the construction industry. In the first stage, a questionnaire was developed, and a survey was carried out among professional and experts who were working with contractors in highway projects. In the second stage, a semi-structured questionnaire was developed, and a survey was carried out to determine the possible mitigation measures of the identified main causes of cost overrun. Collected data for the first stage from experts were inserted in SPSS and were analyzed by using the average index method and the data of the second stage were analyzed by content analysis. It is expected that the findings of this research will be useful and helpful for the construction stakeholders to control and mitigate the major causes of cost overrun.

Keywords:

cost overrun, highway projects, contractors, controlling measures

Downloads

Download data is not yet available.

References

A. A. Jhatial, S. Sohu, N. K. Bhatti, M. T. Lakhiar, R. Oad, “Effect of steel fibres on the compressive and flexural strength of concrete”, International Journal of Advanced and Applied Sciences, Vol. 5, No. 10, pp. 16–21, 2018

Y. Al-Emad, N. Hamid, Structural Relationships Model of Delay Factors in Makkah Construction Industry, Universiti Tun Hussein Onn Malaysia, 2016

I. Mahamid, N. Dmaidi, “Risks leading to cost overrun in building construction from consultants’ perspective”, Organization, Technology and Management in Construction: An International Journal, Vol. 5, No. 2, pp. 860–873, 2013 DOI: https://doi.org/10.5592/otmcj.2013.2.5

D. M. Matin, “Identifying the effective factors for cost overrun and time delay in water construction projects”, Engineering, Technology & Applied Science Research, Vol. 6, No. 4, pp. 1062–1066, 2016 DOI: https://doi.org/10.48084/etasr.706

S. Sohu, A. H. Abdullah, S. Nagapan, A. A. Jhatial, K. Ullah, I. A. Bhatti, “Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan”, Engineering, Technology & Applied Science Research, Vol. 8, No. 2, pp. 2270–2274, 2018 DOI: https://doi.org/10.48084/etasr.1916

M. Siemiatycki, Cost Overruns on Infrastructure Projects: Patterns, Causes, and Cures, Institute on Municipal Finance and Governance, 2015

A. Senouci, A. Ismail, N. Eldin, “Time delay and cost overrun in Qatari public construction projects”, Procedia Engineering, Vol. 164, pp. 368-375, 2016 DOI: https://doi.org/10.1016/j.proeng.2016.11.632

M. A. Akhund, H. U. Imad, N. A. Memon, F. Siddiqui, A. R. Khoso, A. A. Panhwar, “Contributing factors of time overrun in public sector construction projects”, Engineering, Technology & Applied Science Research, Vol. 8, No. 5, pp. 3369–3372, 2018 DOI: https://doi.org/10.48084/etasr.2276

K. Yongjian, F. Y. Y. Ling, Y. Ning, “Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney”, Journal of Financial Management of Property and Construction, Vol. 18, No. 1, pp. 6–25, 2013 DOI: https://doi.org/10.1108/13664381311305050

J. R. Hartley, Concurrent Engineering: Shortening Lead Times, Raising Quality, and Lowering Costs, Routledge, 2017 DOI: https://doi.org/10.1201/9781315140186

A. Aljohani, D. Ahiaga-Dagbui, D. Moore, “Construction projects cost overrun: What does the literature tell us?”, International Journal of Innovation, Management and Technology, Vol. 8, No. 2, pp. 137–143, 2017 DOI: https://doi.org/10.18178/ijimt.2017.8.2.717

U. S. Vaardini, S. Karthiyayini, P. Ezhilmathi, “Study no cost overruns in construction projects–a review”, International Journal of Applied Engineering Research, Vol. 11, No. 3, pp. 356–363, 2016

S. Sohu, A. H. Abdullah, S. Nagapan, A. Fattah, K. Ullah, K. Kumar, “Contractor’s perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan”, in: Proceedings of the International Conference of Global Network for Innovative Technology and AWAM International Conference in Civil Engineering (IGNITE-AICCE’17), pp. 080002-1−080002-6, AIP Publishing, 2017 DOI: https://doi.org/10.1063/1.5005728

M. Ali, S. A. Mangi, S. Sohu, Q. B. Jamali, K. Ullah, “Major factors of budget overrun in construction of road projects of Sindh,Pakistan”, Engineering Science and Technology International Research Journal, Vol. 1, No. 2, pp. 28-32, 2017

S. Sohu, A. H. Abdullah, S. Nagapan, N. A. Memon, R. Yunus, M. F. Hasmori, “Causative factors of cost overrun in building projects of Pakistan”, International Journal of Integrated Engineering, Vol. 10, No. 9, pp. 122-126, 2018

S. Kim, K. N. Tuan, V. T. Luu, “Delay factor analysis for hospital projects in Vietnam”, KSCE Journal of Civil Engineering, Vol. 20, No. 2, pp. 519–529, 2015 DOI: https://doi.org/10.1007/s12205-015-0316-1

G. A. Niazi, N. Painting, “Significant factors causing cost overruns in the construction industry in Afghanistan”, Procedia Engineering, Vol. 182, pp. 510–517, 2017 DOI: https://doi.org/10.1016/j.proeng.2017.03.145

S. Durdyev, M. Omarov, S. Ismail, M. Lim, “Significant contributors to cost overrun in construction projects of Cambodia”, Cogent Engineering, Vol. 4, No. 1, pp. 1–10, 2017 DOI: https://doi.org/10.1080/23311916.2017.1383638

S. P. Wanjari, G. Dobariya, “Identifying factors causing cost overrun of the construction projects in India”, Sadhana, Vol. 41, No. 6, pp. 679-693, 2016 DOI: https://doi.org/10.1007/s12046-016-0498-3

A. Enshassi, J. Al-Najjar, M. Kumaraswamy, “Delays and cost overruns in the construction projects in the Gaza Strip”, Journal of Financial Management of Property and Construction, Vol. 14, No. 2, pp. 126–151, 2009 DOI: https://doi.org/10.1108/13664380910977592

M. S. Ramabodu, J. J. P. Verster, “Factors Contributing to Cost Overruns of Construction Projects”, 5th Built Environment Conference Factors Contributing to Cost Overruns of Construction Projects, Durban, South Africa, July 18-20, 2010

H. Alinaitwe, R. Apolot, D. Tindiwensi, “Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects”, Journal of Construction in Developing Countries, Vol. 18, No. 2, pp. 33–47, 2013

P. T. Gbahabo, O. S. Ajuwon, “Effects of project cost overruns and schedule delays in Sub-Saharan Africa”, European Journal of Interdisciplinary Studies, Vol. 3, No. 2, pp. 46-59, 2017 DOI: https://doi.org/10.26417/ejis.v3i2.p46-59

M. A. Akhund, A. R. Khoso, U. Memon, S. H. Khahro, “Time overrun in construction projects of developing countries”, Imperial Journal of Interdisciplinary Research, Vol. 3, No. 5, pp. 124–129, 2017

A. H. Memon, I. A. Rahman, M. R. Abdullah, A. A. A. Azis, “Factors affecting construction cost performance in project management projects: Case of MARA large projects”, International Journal of Civil Engineering and Built Environment, Vol. 1, No. 1, pp. 30–35, 2014

Z. Shehu, I. R. Endut, A. Akintoye, “Factors contributing to project time and hence cost overrun in the Malaysian construction industry”, Journal of Financial Management of Property and Construction, Vol. 19, No. 1, pp. 55–75, 2014 DOI: https://doi.org/10.1108/JFMPC-04-2013-0009

S. Z. H. S. Jamaludin, M. F. Mohammad, K. Ahmad, “Enhancing the quality of construction environment by minimizing the cost variance”, Procedia-Social and Behavioral Sciences, Vol. 153, pp. 70–78, 2014 DOI: https://doi.org/10.1016/j.sbspro.2014.10.042

N. Roslan, N. Y. Zainun, A. H. Memon, “Measures for controlling time and cost overrun factors during execution stage”, International Journal of Construction Technology and Management, Vol. 1, No. 1, pp. 8–11, 2014

A. S. Ali, S. N. Kamaruzzaman, “Cost performance for building construction projects in Klang Valley”, Journal of Building Performance, Vol. 1, No. 1, pp. 110–114, 2010

N. Azhar, R. U. Farooqui, S. M. Ahmed, “Cost Overrun Factors In Construction Industry of Pakistan”, First International Conference on Construction in Developoing Countries, Karachi, Pakistan, August 4-5, 2008

M. Sambasivan, Y. W. Soon, “Causes and effects of delays in Malaysian construction industry”, International Journal of Project Management, Vol. 25, No. 5, pp. 517–526, 2007 DOI: https://doi.org/10.1016/j.ijproman.2006.11.007

D. S. Tejale, S. D. Khandekar, J. R. Patil, “Analysis of construction project cost overrun by statistical method”, International Journal of Advance Research in Computer Science and Management Studies, Vol. 3, No. 5, pp. 349–355, 2015

H. Samarghandi, S. M. M. Tabatabaei, P. Taabayan, A. M. Hashemi, K. Willoughby, “Studying the reasons for delay and cost overrun in construction projects: The case of Iran”, Journal of Construction in Developing Countries, Vol. 21, No. 1, pp. 51–84, 2016 DOI: https://doi.org/10.21315/jcdc2016.21.1.4

M. Baek, K. Mostaan, B. Ashuri, “Recommended Practices for the Cost Control of Highway Project Development”, Construction Research Congress, Puerto Rico, 2016 DOI: https://doi.org/10.1061/9780784479827.075

Z. T. Zewdu, G. T. Aregaw, “Causes of contractor cost overrun in construction projects: The case of Ethiopian construction sector”, International Journal of Business and Economics Research, Vol. 4, No. 4, pp. 180-191, 2015 DOI: https://doi.org/10.11648/j.ijber.20150404.11

G. B. E. Elanga, P. Louzolo-Kimbembe, C. Pettang, “Evaluation of cost overrun factors in the construction projects in developing countries: Cameroon as case study”, International Journal of Emerging Technology and Advanced Engineering, Vol. 4, No. 10, pp. 533–538, 2014

S. M. Vidalis, F. T. Najafi, “Cost and Time Overruns in Highway Construction”, Canadian Society for Civil Engineering-30th Annual Conference: 2002 Challenges Ahead, Montreal, Canada, June 5-8, 2002

W. J. Hamid, A. Waterman, “Analysis of the main causes of cost overruns in construction industry in developing countries and the UK”, International Review of Civil Engineering, Vol. 9, No. 3, pp. 105-113, 2018 DOI: https://doi.org/10.15866/irece.v9i3.14525

L. Muhwezi, L. M. Chamuriho, N. M. Lema, “An investigation into materials wastes on building construction projects in Kampala-Uganda”, Scholarly Journal of Engineering Research, Vol. 1, No. 1, pp. 11–18, 2012

L. Xin, W. Rong, “Survey Research on Relationship Among Service Failures, Service Recovery and Customer Satisfaction”, International Conference on Management Science and Engineering, Harbin, China, August 20-22, 2007 DOI: https://doi.org/10.1109/ICMSE.2007.4421996

Downloads

How to Cite

[1]
S. Sohu, A. H. Abdullah, S. Nagapan, T. A. Rind, and A. A. Jhatial, “Controlling Measures for Cost Overrun Causes in Highway Projects of Sindh Province”, Eng. Technol. Appl. Sci. Res., vol. 9, no. 3, pp. 4276–4280, Jun. 2019.

Metrics

Abstract Views: 1573
PDF Downloads: 599

Metrics Information

Most read articles by the same author(s)

1 2 3 > >>